✨ Electricity Network Performance Statistics




NEW ZEALAND GAZETTE

No. 74

EASTLAND NETWORK LIMITED

AMENDMENTS TO NEW ZEALAND GAZETTE INFORMATION DISCLOSED ISSUED 23 AUGUST 2002

Reliability Performance Measures (Schedule 1, Part 5)

Para

Interruptions Average Interruption Targets 2003/07 Interruption Targets 2003 Actual interruptions
2002
1 to 3
Class A 54 7
Planned Interruptions 50 3
Class B
Unplanned Interruptions 104 140 137
Class C 237
Class D 1 5
Class E
Class F .
Class G
Class H .
Class I
Total 376 373

4

Proportion of Total Class C Interruptions not restored: (a/b*100/I)

where -

a = No. of interruptions not restored within

Within 3 Hours Within 24 Hours
21 0
b = Total number of Class C interruptions 138

Proportion expressed as a percentage

| | 15.22% | 0.00% |

Reliability Performance Measures (Schedule 1, Part 5)

Para

Faults Average Faults Targets 2003/07 Faults Targets 2003 Actual number of faults
2002
5
Faults per 100 circuit kilometres of prescribed voltage electric line Nominal Voltage 3 3
66kV .
33kV 0 3
11kV 7 7
Total 7 12

| Faults per 100 circuit kilometres of underground prescribed voltage electric line | Nominal Voltage | | | | | |
| 6 | | | 2002 | 2001 | 2000 | 1999 |
| | 50kV | | | | | |
| | 33kV | | 0 | 0 | 1 | 4 |
| | 11kV | | 0 | 1 | 0 | 6 |
| Total | | | 0 | 1 | 4 | 10 |

| Faults per 100 circuit kilometres of overhead prescribed voltage electric line | Nominal Voltage | | 2002 | 2001 | 2000 | 1999 |
| 7 | | | | | | |
| | 50kV | 2 | 2 | 4 | 4 | 6 |
| | 33kV | 3 | 3 | 3 | 3 | 6 |
| | 11kV | 13 | 13 | 8 | 8 | 6 |
| Total | | 12 | 12 | 7 | 7 | 6 |



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 74


Gazette.govt.nz PDF NZ Gazette 2003, No 74





✨ LLM interpretation of page content

πŸ’° Amendments to New Zealand Gazette Information Disclosed for Eastland Network Limited (continued from previous page)

πŸ’° Finance & Revenue
23 August 2002
Statistics, Electricity, Network, Voltage, Capacity, Demand, Consumers, Eastland Network Limited