β¨ Performance Measures
E PERFORMANCE MEASURES
Dunedin
Area only
| 2002 | 2001 | 2000 | 1999 |
|---|
Financial performance measures and efficiency performance measures (Regulation 15)
1 Financial performance measures
(a) Return on funds
15.1% | 15.0% | 13.2% | 15.2%
(b) Return on equity
32.0% | 36.8% | 29.9% | 9.1%
(c) Return on investment
9.0% | 11.7% | 10.7% | 9.1%
2 Efficiency performance measures
(a) Direct line costs per kilometre
$2,217 | $2,148 | $2,325 | $3,314
(b) Indirect line costs per electricity consumer
$24.65 | $19.95 | $15.66 | $21.08
Delivery efficiency performance measures and statistics (Regulation 21)
1 Energy delivery efficiency performance measures
(a) Load factor
53.9% | 55.7% | 56.5% | 56.3%
(b) Loss ratio
6.4% | 6.0% | 6.1% | 5.8%
*Note β the loss ratio is deduced from reports of energy injected by others and reports of retail sales by others. Dunedin Electricity reports is unable to audit these reports and has little confidence in their accuracy. Accordingly the ratio should be treated with caution.
(c) Capacity utilisation
36.2% | 35.7% | 35.0% | 36.5%
2 Statistics
(a) System length
- Circuit kilometres 33 kV
591 | 606 | 621 | 225
- Circuit kilometres 11 kV
1,959 | 1,876 | 1,809 | 258
- Circuit kilometres 6.6 kV
804 | 775 | 751 | 724
- Circuit kilometres 400 V
1,385 | 1,373 | 1,132 | 729
- Circuit kilometres 600 V DC
4 | 4 | 4 | 4
Total
4,743 | 4,634 | 4,317 | 1,940
(b) System length β overhead
- Circuit kilometres 33 kV
503 | 515 | 527 | 150
- Circuit kilometres 11 kV
1,734 | 1,656 | 1,581 | 237
- Circuit kilometres 6.6 kV
579 | 555 | 527 | 492
- Circuit kilometres 400 V
980 | 979 | 791 | 630
- Circuit kilometres 600 V DC
1 | 1 | 1 | 1
Total Overhead
3,797 | 3,706 | 3,426 | 1,510
Amended Information - Refer Note 11
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 28
Gazette.govt.nz —
NZ Gazette 2003, No 28
β¨ LLM interpretation of page content
π Dunedin Electricity Performance Measures
π Trade, Customs & IndustryPerformance Measures, Financial Performance, Efficiency Performance, Delivery Efficiency, Statistics, Dunedin Electricity