3.3 RELIABILITY PERFORMANCE MEASURES
b) The measure of unplanned interruptions directly resulting from unplanned interruptions of a transmission system calculated by the formula a/b where:
a = the sum obtained by adding together the number of customer-hours lost during each interruption; and
b = the total number of customers being supplied by means of the system.
| System | Unplanned interruption measure (resulting from transmission interruptions) | |||
|---|---|---|---|---|
| Jan03-Jun03 | Jan02-Dec02 | Jan01-Dec01 | Apr00-Dec00 | |
| Alfriston | - | - | - | - |
| Ashhurst | - | - | - | - |
| Auckland Central | - | - | - | - |
| Bruce McLaren | - | - | - | - |
| Dannevirke | - | - | - | - |
| Drury | - | - | - | - |
| Feilding | - | - | - | - |
| Foxton | - | - | - | - |
| Hastings | - | - | - | - |
| Hunua | - | - | - | - |
| Kakariki | - | - | - | - |
| Kairanga | - | - | - | - |
| Kingseat | - | - | - | - |
| Levin | - | - | - | - |
| Longburn | - | - | - | - |
| Mangaroa | - | - | - | - |
| Mangatainoka | - | - | - | - |
| Oroua Downs | - | - | - | - |
| Pahiatua | - | - | - | - |
| Palmerston North | - | - | - | - |
| Pukekohe | - | - | - | - |
| Ramarama | - | - | - | - |
| Takapau | - | - | - | - |
| Tuakau | - | - | - | - |
| Waiuku | - | - | - | - |
| Wellington | - | - | - | - |
PUBLISHED BY THE
DEPARTMENT OF INTERNAL AFFAIRS
PRINTED BY WICKLIFFE LIMITED
LexisNexis
THE DEPARTMENT OF INTERNAL AFFAIRS
Te Tari Taiwhenua
ISSN 0111-5650
Price $5.00 (inc. G.S.T.)
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 163
Gazette.govt.nz —
NZ Gazette 2003, No 163
β¨ LLM interpretation of page content
π°
Performance Measures and Statistics
(continued from previous page)
π° Finance & RevenueFinancial Performance, Efficiency Measures, Accounting Return, Profit Rates, Direct Line Costs, Indirect Line Costs, Energy Delivery, Load Factor, Unaccounted-for Gas Ratio, System Length, Gas Pipelines, UnitedNetworks, PowerCo