✨ Reliability Performance Measures




4566

PUBLISHED BY THE
DEPARTMENT OF INTERNAL AFFAIRS
PRINTED BY WICKLIFFE LIMITED

NEW ZEALAND GAZETTE

No. 163

ISSN 0111-5650

Price $5.00 (inc. G.S.T.)

4566

NEW ZEALAND GAZETTE

No. 163

3.3 RELIABILITY PERFORMANCE MEASURES

b) The measure of unplanned interruptions directly resulting from unplanned interruptions of a transmission system calculated by the formula a/b where:

a = the sum obtained by adding together the number of customer-hours lost during each interruption; and

b = the total number of customers being supplied by means of the system.

System Unplanned interruption measure (resulting from transmission interruptions)
Jan03-Jun03 Jan02-Dec02 Jan01-Dec01 Apr00-Dec00
Alfriston - - - -
Ashhurst - - - -
Auckland Central - - - -
Bruce McLaren - - - -
Dannevirke - - - -
Drury - - - -
Feilding - - - -
Foxton - - - -
Hastings - - - -
Hunua - - - -
Kakariki - - - -
Kairanga - - - -
Kingseat - - - -
Levin - - - -
Longburn - - - -
Mangaroa - - - -
Mangatainoka - - - -
Oroua Downs - - - -
Pahiatua - - - -
Palmerston North - - - -
Pukekohe - - - -
Ramarama - - - -
Takapau - - - -
Tuakau - - - -
Waiuku - - - -
Wellington - - - -

PUBLISHED BY THE
DEPARTMENT OF INTERNAL AFFAIRS
PRINTED BY WICKLIFFE LIMITED

LexisNexis

THE DEPARTMENT OF INTERNAL AFFAIRS
Te Tari Taiwhenua

ISSN 0111-5650
Price $5.00 (inc. G.S.T.)




Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 163


Gazette.govt.nz PDF NZ Gazette 2003, No 163





✨ LLM interpretation of page content

πŸ’° Performance Measures and Statistics (continued from previous page)

πŸ’° Finance & Revenue
Financial Performance, Efficiency Measures, Accounting Return, Profit Rates, Direct Line Costs, Indirect Line Costs, Energy Delivery, Load Factor, Unaccounted-for Gas Ratio, System Length, Gas Pipelines, UnitedNetworks, PowerCo