Energy Delivery Efficiency Statistics




4560

NEW ZEALAND GAZETTE

No. 163

3.2 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

2 Statistics

a) System length

The system length of each system, in kilometres as calculated by the formula a+b/2 where:

a = system length at the beginning of the financial year

b = system length at the end of the financial year

System Jan03-Jun03 Jan02-Dec02 Jan01-Dec01 Apr00-Dec00
Alfriston 0.032 0.032 0.143 0.254
Ashhurst - 11.137√ 22.308 22.314
Auckland Central 4761.716 4,709.510 4,457.733 4,280.361
Bruce McLaren^ - 43.307 86.614 70.561
Dannevirke - 10.012√ 18.267 16.560
Drury 9.004 9.004 9.004 8.916
Feilding - 84.221√ 168.680 167.593
Foxton - 16.773√ 33.512 33.389
Hastings - 143.712√ 338.252 388.576
Hunua 2.376 2.389 2.210 2.053
Kakariki - 0.950√ 1.901 1.712
Kairanga - 3.672√ 7.345 7.342
Kingseat 6.439 6.439 6.439 6.450
Levin - 102.881√ 207.558 207.716
Longburn - 18.197√ 36.425 36.406
Mangaroa - - 0.003 0.003
Mangatainoka - 0.587√ 1.174 1.173
Oroua Downs - 1.830√ 3.660 3.687
Pahiatua - 6.012√ 12.033 11.984
Palmerston North - 362.537√ 733.717 741.363
Pukekohe 14.373 14.510 14.439 13.746
Ramarama 4.193 4.195 1.659 0.656
Takapau - 2.000√ 4.000 4.001
Tuakau 4.075 4.075 4.075 4.076
Waiuku^ - 0.073 0.145 0.145
Wellington - 467.480√ 926.686 912.173

^ During 2002 the Waimauku and Waiuku gates were removed. Bruce McLaren has been interconnected with other Auckland Central Networks.

√ UnitedNetworks sold the gas pipelines in Hawkes Bay, Palmerston North and Wellington to PowerCo effective from 1 November 2002. This has affected the system length as 'b' in the above formula is nil.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 163


Gazette.govt.nz PDF NZ Gazette 2003, No 163





✨ LLM interpretation of page content

💰 Performance Measures and Statistics (continued from previous page)

💰 Finance & Revenue
Financial Performance, Efficiency Measures, Accounting Return, Profit Rates, Direct Line Costs, Indirect Line Costs, Energy Delivery, Load Factor, Unaccounted-for Gas Ratio, System Length, Gas Pipelines, UnitedNetworks, PowerCo