✨ Energy Efficiency Statistics
3.2 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS
For the six months ended 30 June 2003
Schedule 1 – PART 3
1 Energy delivery efficiency performance measures
a) Load factor
As calculated by the formula a/(12 x b) expressed as a percentage, where:
a = the amount of gas entering the system or systems during the financial year; and
b = the maximum monthly amount of gas entering the system or systems.
| System | Load factor (%) |
|---|---|
| Jan03-Jun03² | |
| Alfriston | 51.14 |
| Ashhurst | - |
| Auckland Central | 84.54 |
| Bruce McLaren^ | - |
| Dannevirke | - |
| Drury | 66.69 |
| Feilding | - |
| Foxton | - |
| Hastings | - |
| Hunua | 83.59 |
| Kakariki | - |
| Kairanga | - |
| Kingseat | 45.16 |
| Levin | - |
| Longburn | - |
| Mangaroa | - |
| Mangatainoka | - |
| Oroua Downs | - |
| Pahiatua | - |
| Palmerston North | - |
| Pukekohe | 74.43 |
| Ramarama | 54.57 |
| Takapau | - |
| Tuakau | 68.66 |
| Waimaku^ | - |
| Waikuku^ | - |
| Wellington | - |
^ During 2002 the Waimaku and Waikuku gates were removed. Bruce McLaren has been interconnected with other Auckland Central Networks.
¹ As there is only 9 months data (1Apr00-31Dec00) for the financial period comparative, the formula a/(9 x b) is used.
² As there is only 6 months data (1Jan03-30Jun03) for the financial period comparative, the formula a/(6 x b) is used.
ᵛ UnitedNetworks sold the gas pipelines in Hawkes Bay, Palmerston North and Wellington to PowerCo effective from 1 November 2002. This has affected the formula; a/(10 x b) has been used.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 163
Gazette.govt.nz —
NZ Gazette 2003, No 163
✨ LLM interpretation of page content
💰
Performance Measures and Statistics
(continued from previous page)
💰 Finance & RevenueFinancial Performance, Efficiency Measures, Accounting Return, Profit Rates, Direct Line Costs, Indirect Line Costs, Energy Delivery, Load Factor