Energy Efficiency Statistics




3.2 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

For the six months ended 30 June 2003

Schedule 1 – PART 3

1 Energy delivery efficiency performance measures

a) Load factor

As calculated by the formula a/(12 x b) expressed as a percentage, where:

a = the amount of gas entering the system or systems during the financial year; and

b = the maximum monthly amount of gas entering the system or systems.

System Load factor (%)
Jan03-Jun03²
Alfriston 51.14
Ashhurst -
Auckland Central 84.54
Bruce McLaren^ -
Dannevirke -
Drury 66.69
Feilding -
Foxton -
Hastings -
Hunua 83.59
Kakariki -
Kairanga -
Kingseat 45.16
Levin -
Longburn -
Mangaroa -
Mangatainoka -
Oroua Downs -
Pahiatua -
Palmerston North -
Pukekohe 74.43
Ramarama 54.57
Takapau -
Tuakau 68.66
Waimaku^ -
Waikuku^ -
Wellington -

^ During 2002 the Waimaku and Waikuku gates were removed. Bruce McLaren has been interconnected with other Auckland Central Networks.

¹ As there is only 9 months data (1Apr00-31Dec00) for the financial period comparative, the formula a/(9 x b) is used.

² As there is only 6 months data (1Jan03-30Jun03) for the financial period comparative, the formula a/(6 x b) is used.

ᵛ UnitedNetworks sold the gas pipelines in Hawkes Bay, Palmerston North and Wellington to PowerCo effective from 1 November 2002. This has affected the formula; a/(10 x b) has been used.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 163


Gazette.govt.nz PDF NZ Gazette 2003, No 163





✨ LLM interpretation of page content

💰 Performance Measures and Statistics (continued from previous page)

💰 Finance & Revenue
Financial Performance, Efficiency Measures, Accounting Return, Profit Rates, Direct Line Costs, Indirect Line Costs, Energy Delivery, Load Factor