✨ Electricity Information Disclosure




The Electricity Information Disclosure Regulations 1999

(For 12 months ending 30 June 2003, 30 June 2002, 30 June 2001, 30 June 2000)

Part 4

Energy Delivery Efficiency Performance Measures and Statistics

(Disclosure under Regulation 21)

  1. Energy delivery efficiency performance measures

    (a) Load factor
    Electrical energy entering the transmission system as percentage of maximum demand times hours per year
    | % |
    |--------|
    | 70.50 | 2002/03 |
    | 67.09 | 2001/02 |
    | 68.67 | 2000/01 |
    | 69.08 | 1999/00 |

    (b) Loss ratio
    Transmission losses as percentage of energy entering the system
    | % |
    |--------|
    | 4.36 | 2002/03 |
    | 2.90 | 2001/02 |
    | 4.65 | 2000/01 |
    | 3.97 | 1999/00 |

    (c) Capacity utilisation
    Maximum demand as percentage of total transformer capacity #
    | % |
    |--------|
    | 69.86 | 2002/03 |
    | 70.71 | 2001/02 |
    | 71.00 | 2000/01 |
    | 69.11 | 1999/00 @ |

  2. Statistics

    (a) System length, broken down by voltage

    Total km 17,134 2002/03
    350 kV (HVDC) km 611
    270 kV (HVDC) km 611
    0 kV (HVDC earth electrode) km 31
    220 kV (HVAC) km 8,357
    110 kV (HVAC) km 6,076
    66/50/33/11 kV km 1,449
    17,145 2001/02
    611
    611
    31
    8,357
    6,108
    1,428
    17,288 2000/01
    611
    611
    31
    8,357
    6,134
    1,545
    17,542 1999/00
    611
    611
    31
    8,365
    6,212
    1,712

    (b) Circuit length of overhead electric lines, broken down by voltage

    Total km 17,049 2002/03
    350 kV (HVDC) km 571
    270 kV (HVDC) km 571
    0 kV (HVDC earth electrode) km 31
    220 kV (HVAC) km 8,357
    110 kV (HVAC) km 6,071
    66/50/33/11 kV km 1,449
    17,060 2001/02
    571
    571
    31
    8,357
    6,103
    1,428
    17,203 2000/01
    571
    571
    31
    8,357
    6,129
    1,545
    17,457 1999/00
    571
    571
    31
    8,365
    6,207
    1,712

    NB: HVDC link submarine power cables measure approximately 80km. Broken down by voltage

    | 350 kV (HVDC) | km | 40 | 2002/03 |
    | 270 kV (HVDC) | km | 40 | |

    (c) Total circuit length of underground electric lines
    (110 kV HVAC)
    | | km | 5 | 2002/03 |

    (d) Transformer capacity
    (kilovolt amperes) #
    | | kVA | 8.64x10^5 | 2002/03 |
    | | | 8.59x10^5 | 2001/02 |
    | | | 8.53x10^5 | 2000/01 |
    | | | 8.43x10^5 | 1999/00 |

    (e) Maximum demand
    (kilowatts) *
    | | kW | 6.04x10^5 | 2002/03 |
    | | | 6.07x10^5 | 2001/02 |
    | | | 6.05x10^5 | 2000/01 |
    | | | 5.83x10^5 | 1999/00 |

    (f) Total electricity entering the system (before losses of electricity), in kilowatt hours *
    | | kWh | 37.28x10^9 | 2002/03 |
    | | | 35.70x10^9 | 2001/02 |
    | | | 36.42x10^9 | 2000/01 |
    | | | 35.28x10^9 | 1999/00 |

    (g) The total amount of electricity (in kilowatt hours) supplied from the system (after losses of electricity) during the financial year on behalf of each person that is an electricity generator or an electricity retailer, or both *
    | | kWh | 35.65x10^9 | 2002/03 |
    | | | 34.66x10^9 | 2001/02 |
    | | | 34.72x10^9 | 2000/01 |
    | | | 33.88x10^9 | 1999/00 |

    (h) Total connected customers
    | | | 48 | 2002/03 |
    | | | 49 | 2001/02 |
    | | | 50 | 2000/01 |
    | | | 54 | 1999/00 |

    • to 2 decimal places only, higher accuracy used in calculations

      Installed transformer capacity based on ONAN ratings.

      @ 1999/00 calculation corrected.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 162


Gazette.govt.nz PDF NZ Gazette 2003, No 162





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy delivery efficiency, Load factor, Loss ratio, Capacity utilisation, System length, Circuit length, Transformer capacity, Maximum demand, Electricity supply, Connected customers