β¨ Electricity Performance Measures
Reliability Performance Measures
1 Number of interruption by class
| Class Description | 2003 | 2002 | 2001 | 2000 |
|---|---|---|---|---|
| number of interruptions | ||||
| A Transpower Planned | - | - | - | - |
| B Nelson Electricity Planned | 22 | 9 | 9 | 22 |
| C Nelson Electricity Unplanned | 13 | 7 | 6 | 8 |
| D Transpower Unplanned | - | - | - | - |
| E ECNZ Unplanned | - | - | - | - |
| F Other Generation | - | - | - | - |
| G Unplanned Other Line Owner | - | - | - | - |
| H Planned Other Line Owner | - | - | - | - |
| I Other | - | - | - | - |
| Total | 35 | 16 | 15 | 30 |
2/3 Interruption targets
| Class Description | average target | target |
| | 2004-08 | 2004 |
| B Nelson Electricity Planned (a) | 25 | 25 |
| C Nelson Electricity Unplanned (b) | 8 | 8 |
4 Percentage of Class C interruptions not restored
| 2003 | 2002 | 2001 | 2000 | |
|---|---|---|---|---|
| % of total class interruptions | ||||
| (a) Three hours | 7.7% | 14.0% | 0.0% | 12.5% |
| (b) 24 hours | 0.0% | 0.0% | 0.0% | 0.0% |
5 Faults (Class C) per 100 kilometres
| 2003 | 2002 | 2001 | 2000 | |
|---|---|---|---|---|
| (a) Total number of faults per 100 km | ||||
| Voltage | ||||
| 33 kV | 11.45 | - | 4.80 | 9.70 |
| 11kV | 14.03 | 3.87 | 2.60 | 8.10 |
| Total | 13.55 | 3.87 | 3.10 | 8.40 |
| | average target | target |
| | 2004-08 | 2004 |
| (b/c) Fault targets | |
| Voltage | |
| 33 kV | 3.80 | 3.80 |
| 11kV | 3.80 | 3.80 |
| Total | 3.80 | 3.80 |
6 Faults (Class C) per 100 kilometres underground
| Voltage | 2003 | 2002 | 2001 | 2000 |
|---|---|---|---|---|
| 33 kV | - | - | - | 10.32 |
| 11kV | 8.67 | 2.92 | 1.50 | 6.05 |
| Total | 7.57 | 2.92 | 1.30 | 6.60 |
7 Faults (Class C) per 100 kilometres overhead
| Voltage | 2003 | 2002 | 2001 | 2000 |
|---|---|---|---|---|
| 33 kV | 26.76 | - | 9.10 | 9.10 |
| 11kV | 54.34 | 10.87 | 11.10 | 24.50 |
| Total | 41.97 | 10.87 | 10.00 | 15.60 |
amended information β refer note 15
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 140
Gazette.govt.nz —
NZ Gazette 2003, No 140
β¨ LLM interpretation of page content
ποΈ
Nelson Electricity Limited Performance Measures
(continued from previous page)
ποΈ Infrastructure & Public WorksElectricity, Interruptions, Faults, Performance, Reliability, Targets, Statistics