✨ Energy Performance Statistics




3274 NEW ZEALAND GAZETTE No. 120

B8. The SAIFI for the total number of interruptions within each interruption class:

Network or Generation Owner Classification Interruption per Connected Customer (%)
2003
MainPower Planned Shut-Down (Class B) 0.26
Unplanned Interruption (Class C) 1.46
Trans Power Planned Shut-Down (Class A) 0.19
Unplanned Interruption (Class D) 0.79
Generation Unplanned Interruption (Class E) -
Generation Other Unplanned Interruption (Class F) -
Other Other Interruptions (Class G) -
Unplanned Interruption (Class G) -

B9. The CAIDI for the total of all interruptions:

2003 2002 2001 2000
105.39 147.82 73.16 65.99

B10. The CAIDI for the total number of interruptions within each interruption class:

Network or Generation Owner Classification Minutes per Customer Interruption
2003
MainPower Planned Shut-Down (Class B) 236.45
Unplanned Interruption (Class C) 53.44
Trans Power Planned Shut-Down (Class A) 387.19
Unplanned Interruption (Class D) 90.03
Generation Unplanned Interruption (Class E) -
Generation Other Unplanned Interruption (Class F) -
Other Other Interruptions (Class G) -
Unplanned Interruption (Class G) -


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 120


Gazette.govt.nz PDF NZ Gazette 2003, No 120





✨ LLM interpretation of page content

🌾 MainPower New Zealand Ltd Energy Efficiency Performance Measures and Statistics (continued from previous page)

🌾 Primary Industries & Resources
Energy, Efficiency, Reliability Performance Measures, Interruptions, Faults, SAIDI, SAIFI, Electricity Supply