β¨ Energy Efficiency Performance Measures
29 AUGUST NEW ZEALAND GAZETTE 3269
MAINPOWER NEW ZEALAND LTD
DISCLOSURE OF ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS
PURSUANT TO REGULATION 21 AND PART IV OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1999 (AS AMENDED)
For the Year Ended 31 March 2003 2002 2001 2000
- Energy Delivery Efficiency Performance Measures
(a) Load Factor
Electrical energy entering the distribution system
Maximum demand Γ Hours per year 62.00% 63.84% 68.77% 59.09%
(b) Loss Ratio
Distribution losses
Energy entering the system 5.90% 6.02% 5.84% 5.28%
(c) Capacity Utilisation
Maximum demand
Total transformer capacity 28.25% 26.54% 27.30% 29.80%
- Statistics
(a) System length, by voltage:
| Voltage | Circuit Length Kms |
|---|---|
| 2003 | |
| ------------- | ------- |
| 400/230 | 583 |
| 11000 | 3161 |
| 33000 | 309 |
| Total | 4053 |
(b) Circuit length of overhead electric lines, by voltage:
| Voltage | Circuit Length Kms |
|---|---|
| 2003 | |
| ------------- | ------- |
| 400/230 | 284 |
| 11000 | 3056 |
| 33000 | 307 |
| Total | 3647 |
(c) Circuit length of underground electric lines, by voltage:
| Voltage | Circuit Length Kms |
|---|---|
| 2003 | |
| ------------- | ------- |
| 400/230 | 299 |
| 11000 | 105 |
| 33000 | 2 |
| Total | 406 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 120
Gazette.govt.nz —
NZ Gazette 2003, No 120
β¨ LLM interpretation of page content
πΎ MainPower New Zealand Ltd Energy Efficiency Performance Measures and Statistics
πΎ Primary Industries & ResourcesEnergy, Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Overhead Lines, Underground Lines