β¨ Electricity Industry Disclosures
3144
NEW ZEALAND GAZETTE
No. 115
16 DISCLOSURE OF OPTIMAL DEPRIVAL VALUE (ODV) PURSUANT TO REGULATION 20
OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1999
ODV as per latest valuation
2003 2002 2001 2000
703,268,496 377,155,871 374,105,277 $253,264,729
17 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 21
AND PART IV OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION
DISCLOSURE) REGULATIONS 1999
17.1
2003 2002 2001 2000
Powerco Powerco Powerco
(a) Load Factor (time weighted) 71.7% 63.5% 63.91% 63.26%
(b) Loss Ratio (time weighted using actual data) 6.57% 5.88% 6.80% 6.80%
(c) Capacity Utilisation (time weighted) 25.7% 28.44% 28.19% 29.28%
Notes:
17.1 (a): Load factor is calculated using the time weighted average method. The load factor calculated using full-year actual data is 66.8%.
17.1 (b): Loss ratio is calculated using full year kWh data for Western area, and 5 month (1 Nov 2002 to 31 Mar 03) kWh data for Eastern area. It is a time weighted calculation based on actual data.
17.1 (c): Capacity utilisation is calculated using the time weighted average method. The capacity utilisation calculated using full-year actual data is 28%.
17.2 (a) System Length
| Nominal Voltage | 2003 Powerco Total System Length (km) | 2002 Powerco Total System Length (km) | 2001 Powerco Total System Length (km) | 2000 Powerco Total System Length (km) |
|---|---|---|---|---|
| 110kV | 0.00 | - | - | - |
| 66kV | 62.64 | |||
| 33kV | 1,193.80 | 1,030.26 | 1,030.53 | 747.30 |
| 22kV | 107.06 | 107.70 | 113.31 | 113.50 |
| 11kV | 11,869.06 | 9,896.20 | 9,501.67 | 6,403.44 |
| 6.6kV | 442.69 | 444.73 | 430.75 | 834.44 |
| 230/400V | 5,883.85 | 4,481.57 | 4,236.34 | 2,760.21 |
| Total | 19,569.11 | 15,960.46 | 15,312.60 | 10,858.89 |
(b) Overhead Line Length
| Nominal Voltage | 2003 Powerco O/H Line Length (km) | 2002 Powerco O/H Line Length (km) | 2001 Powerco O/H Line Length (km) | 2000 Powerco O/H Line Length (km) |
|---|---|---|---|---|
| 110kV | 0.00 | - | - | - |
| 66kV | 62.61 | |||
| 33kV | 1,122.13 | 984.31 | 975.51 | 731.14 |
| 22kV | 106.71 | 107.37 | 113.07 | 113.23 |
| 11kV | 10,959.88 | 9,378.37 | 9,012.63 | 6,179.87 |
| 6.6kV | 432.40 | 434.95 | 430.75 | 828.52 |
| 230/400V | 4,043.87 | 3,252.62 | 3,077.06 | 2,300.18 |
| Total | 16,727.59 | 14,157.62 | 13,609.03 | 10,152.94 |
(c) Underground Line Length
| Nominal Voltage | 2003 Powerco U/G Line Length (km) | 2002 Powerco U/G Line Length (km) | 2001 Powerco U/G Line Length (km) | 2000 Powerco U/G Line Length (km) |
|---|---|---|---|---|
| 110 kV | 0.00 | - | ||
| 66kV | 0.03 | |||
| 33kV | 71.67 | 45.96 | 55.02 | 16.16 |
| 22kV | 0.35 | 0.33 | 0.24 | 0.27 |
| 11kV | 909.18 | 517.83 | 485.76 | 223.57 |
| 6.6kV | 10.29 | 9.78 | 3.27 | 5.92 |
| 230/400V | 1,839.98 | 1,228.95 | 1,159.28 | 460.03 |
| Total | 2,831.52 | 1,802.85 | 1,703.57 | 705.95 |
Note:
17.2 (a) - (c): System lengths are calculated using the weighted average method. The system length (HV and LV) using actual data at the financial year-end is 24,978 km.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 115
Gazette.govt.nz —
NZ Gazette 2003, No 115
β¨ LLM interpretation of page content
π
Powerco Limited Financial Statements
(continued from previous page)
π Trade, Customs & Industry21 August 2003
Electricity, Financial Statements, Operating Revenue, Operating Expenditure, Line Charges, Interest, AC Loss-Rental Rebates, Transmission Charges, Asset Maintenance, Depreciation, Amortisation, Corporate Expenses, Donations, Directors' Fees, Auditors' Fees, Bad Debts, Doubtful Debts, Local Authority Rates, Subvention Payments, Unusual Expenses, Employee Salaries, Wages, Redundancies, Revaluations, Intangible Assets, System Fixed Assets, ODV Value
π Disclosure of Optimal Deprival Value (ODV) Pursuant to Regulation 20
π Trade, Customs & IndustryElectricity, Optimal Deprival Value, ODV, Valuation, Powerco
π Disclosure of Performance Measures Pursuant to Regulation 21
π Trade, Customs & IndustryElectricity, Performance Measures, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Overhead Line, Underground Line, Powerco