Schedule 1 Part 5 Reliability Performance Measures to be Disclosed by Line Owners Other Than Transpower

Faults per 100 km (Underground) TOTAL
33 kV 11 kV
7 8.9,10,11

| Actual | | | |
| 2003 | 1.72 | 1.46 | 1.76 |
| 2002 | 3.61 | 3.04 | 3.77 |
| 2001 | 2.42 | 3.57 | 3.38 |
| 2000 | 1.34 | 4.25 | 2.77 |
| 1999 | | 2.96 | 2.76 |

| Target | | | |
| 2004 | | | |
| 2008-10 2008 | | | |

| SAIDI | | Planned outages TransPower |
| | Class A |
| | 4.60 |
| | 4.57 |
| | 4.55 |
| | 1.67 |
| | 4.00 |

| | Class B | Planned outages WEL |
| | 54.80 |
| | 5.57 |
| | 26.56 |
| | 92.11 |
| | 67.23 |

| | Class C | Unplanned outages TransPower |
| | 13.37 |
| | 5.02 |
| | 26.56 |
| | 0.15 |
| | - |

| | Class D | Unplanned outages WEL |
| | - |
| | - |
| | 106.83 |
| | - |
| | - |

| | Class E | Unplanned Interruption ECNZ |
| | - |
| | - |
| | - |
| | - |

| | Class F | Unplanned Interruption other generally |
| | - |
| | - |
| | - |
| | - |

| | Class G | Other Interruption |
| | - |
| | - |
| | - |
| | 93.93 |

| TOTAL |
| | 181.61 |
| | 76.21 |
| | 116.21 |
| | 157.67 |
| | - |



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 112


Gazette.govt.nz PDF NZ Gazette 2003, No 112





✨ LLM interpretation of page content

πŸ’° Statement of Performance Measures for the year ended 31 March 2003 (continued from previous page)

πŸ’° Finance & Revenue
Energy delivery, Efficiency measures, Load factor, Loss ratio, Capacity utilization, Circuit km, Transformer capacity, Maximum demand, Electricity supply, Customers

πŸ—οΈ Schedule 1 Part 5 Reliability Performance Measures for Line Owners Other Than Transpower

πŸ—οΈ Infrastructure & Public Works
Reliability, Performance Measures, Line Owners, Faults per 100 km, SAIDI, Planned outages, Unplanned outages