✨ Electricity Performance Metrics




20 AUGUST

NEW ZEALAND GAZETTE

2827

8 SAIDI
Customer Minutes

2003 2002 2001 2000
99.6 38.7 41.0 77.0

9/10 SAIDI target

2004 to 2008

average SAIDI for each year over this period

(a) Class B 15
(b) Class C 25

11 SAIDI per interruption class

Class Description 2003 2002 2001 2000 (customer minutes)
A Transpower Planned - - - -
B Nelson Electricity Planned 27.4 0.6 13.0 16.0
C Nelson Electricity Unplanned 72.1 38.1 28.0 60.0
D Transpower Unplanned - - - -
E ECNZ Unplanned - - - -
F Other Generation - - - -
G Unplanned Other Line Owner - - - -
H Planned Other Line Owner - - - -
I Other - - - -

12 SAIFI
Total Interruptions

2003 2002 2001 2000
1.4 1.0 1.8 1.3

13/14 SAIFI target

2004 to 2008

average SAIFI for each year over this period

(a) Class B Planned 0.3
(b) Class C Unplanned 0.6

15 SAIFI per interruption class

Class Description 2003 2002 2001 2000 (customer minutes)
A Transpower Planned - - - -
B Nelson Electricity Planned 0.2 0.0 0.1 0.1
C Nelson Electricity Unplanned 1.3 1.0 1.7 1.2
D Transpower Unplanned - - - -
E ECNZ Unplanned - - - -
F Other Generation - - - -
G Unplanned Other Line Owner - - - -
H Planned Other Line Owner - - - -
I Other - - - -

16 CAIDI
Customer minutes

2003 2002 2001 2000
69.6 40.5 23.0 58.7

17 CAIDI target

2004 to 2008

average CAIDI for each year over this period

(a) Class B Planned 33.3
(b) Class C Unplanned 33.3

19 CAIDI per interruption class

Class Description 2003 2002 2001 2000 (customer minutes)
A Transpower Planned - - - -
B Nelson Electricity Planned 171.1 134.5 217.5 173.2
C Nelson Electricity Unplanned 57.0 40.1 16.4 49.8
D Transpower Unplanned - - - -
E ECNZ Unplanned - - - -
F Other Generation - - - -
G Unplanned Other Line Owner - - - -
H Planned Other Line Owner - - - -
I Other - - - -

LexisNexis



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 107


Gazette.govt.nz PDF NZ Gazette 2003, No 107





✨ LLM interpretation of page content

πŸ—οΈ NELSON ELECTRICITY LIMITED Performance Measures (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Electricity, Performance Measures, Financial Performance, Efficiency Performance, Energy Delivery, Statistics, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply, Retailers