i. Total number of interruptions and breakdowns by interruption class

Class Type of Interruption 5 Yr Average Target 2004 2003 No 2002 No 2001 No 2000 No
A Planned - Transpower 160 0 4 2 2
B Planned - Top Energy [162] 144 195 218 295
C Unplanned - Top Energy [200] 249 244 235 192
D Unplanned - Transpower [220] 0 6 0 0
E Unplanned - Embedded Generation 0 0 0 0
F Unplanned - Other Generation 0 0 0 0
G Unplanned - Another Line owner 6 0 0 0
H Planned - Another Line owner 0 0 0 0
I Any other interruption 0 0 0 0
Total - All interruptions 399 447 453 489

Class C: Interruptions not restored:

  • a. Within 3 hours: 16% (5 Yr Average 3.5%), 6% (Target 2004), 34% (2002), 27% (2001), 10% (2000)
  • b. Within 24 hours: 0% (all years)

ii. Number of faults per 100 circuit kms

Line Voltage Total Underground Overhead
2003 2002 2001 2000 2003 2002
-------------- ------ ------ ------ ------ ------ ------
100kV
66kV 7.74 4.10 4.08 3.67 0 0
33kV 0 0
11kV 7.21 7.34 7.14 5.86 0 0
6.6kV
3.3kV
Total 7.25 7.81 6.92 5.70 0 0
Target Faults: 5 Yr Average Target 2004
33kV 3.8 4.0
11kV 5.8 5.8
Total 5.8 5.8

iii. Breakdown of statistics by interruption class

Class Type of Interruption SAIDI (Minutes) SAIFI (Interruptions) CAIDI (Minutes)
2003 2002 2001
-------------------------------------- ------ -------- -------
A. Planned - Transpower 0.0 148.0 0.0
B. Planned - Top Energy 37.0 48.0 83.0
C. Unplanned - Top Energy 382.9 287.0 246.0
D. Unplanned - Transpower 0.0 191.0 0.0
E. Unplanned - Embedded Generation 0.0 0.0 0.0
F. Unplanned - Other Generation 0.0 0.0 0.0
G. Unplanned - Another Line owner 0.0 0.0 0.0
H. Planned - Another Line owner 0.0 0.0 0.0
I. Any other interruption 0.0 0.0 0.0
Total - All interruptions 419.9 674.0 329.0
Targets: SAIDI SAIFI CAIDI
5 Yr Average Target 2004 5 Yr Average
B. Planned - Top Energy 50 50 0.3
C. Unplanned - Top Energy 250 265 4.7


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 105


Gazette.govt.nz PDF NZ Gazette 2003, No 105





✨ LLM interpretation of page content

🏭 Top Energy Limited Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy, Reliability, Performance Measures, Statistics, Interruptions, Faults, SAIDI, SAIFI, CAIDI