✨ Electricity Reliability Performance Measures




Regulation 22

Disclosure by line owners (other than Transpower) of reliability performance measures

1 Total number of interruptions:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions 2003 2002 2001 2000
Orion B Planned Shutdowns 356 220 162 313
C Unplanned Cuts 611 404 499 545
Transpower A Planned Shutdowns 0 0 0 3
D Unplanned Cuts 4 2 3 1

Total Interruptions | 971 | 626 | 664 | 862 |

Disclosure Regulation classes E, F and G do not apply to Orion and consequently results are all zero.

2 & 3 Interruption targets:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions 2004 Average 2004 - 2008
Orion B Planned Shutdowns 385 385
C Unplanned Cuts 555 555

4 Proportion of Class C interruptions not restored within:

(a) 3 hours 25.37%

(b) 24 hours 2.30%

5(a) Faults per 100 circuit-km of electric line:

2003 2002 2001 2000
66kV 4.4 2.9 0.0 1.7
33kV 3.9 3.7 2.8 4.3
11kV 11.6 7.7 9.7 10.0
All 10.9 7.3 9.1 9.5

(b) & (c) Target number of faults per 100 circuit-km of electric line:

2004 Average 2004 - 2008
66kV 2.0 2.0
33kV 4.0 4.0
11kV 12.0 12.0
All 11.2 11.2


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 103


Gazette.govt.nz PDF NZ Gazette 2003, No 103





✨ LLM interpretation of page content

🌾 Disclosure of Reliability Performance Measures by Line Owners (continued from previous page)

🌾 Primary Industries & Resources
Electricity, Reliability performance, Interruptions, Faults, Orion, Transpower