✨ Energy Reliability Performance Measures




NEW ZEALAND GAZETTE

No. 99

B8. The SAIFI for the total number of interruptions within each interruption class:

Network or Generation Owner Classification Interruption per Connected Customer (%)
2002
MainPower Planned Shut-Down (Class B) 0.37
Unplanned Interruption (Class C) 0.87
Trans Power Planned Shut-Down (Class A) 0.21
Unplanned Interruption (Class D) -
Generation Unplanned Interruption (Class E) -
Generation Other Unplanned Interruption (Class F) -
Other Other Interruptions (Class G) -
Unplanned Interruption (Class G) -

B9. The CAIDI for the total of all interruptions:

2002 2001 2000 1999
147.82 73.16 65.99 111.66

B10. The CAIDI for the total number of interruptions within each interruption class:

Network or Generation Owner Classification Minutes per Customer Interruption
2002
MainPower Planned Shut-Down (Class B) 297.04
Unplanned Interruption (Class C) 59.67
Trans Power Planned Shut-Down (Class A) 256.28
Unplanned Interruption (Class D) -
Generation Unplanned Interruption (Class E) -
Generation Other Unplanned Interruption (Class F) -
Other Other Interruptions (Class G) -
Unplanned Interruption (Class G) -


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 99


Gazette.govt.nz PDF NZ Gazette 2002, No 99





✨ LLM interpretation of page content

🌾 Disclosure of Reliability Performance Measures for MainPower New Zealand Ltd (continued from previous page)

🌾 Primary Industries & Resources
Energy Reliability, Performance Measures, Electricity, MainPower New Zealand Ltd, Interruptions, Faults