Buller Electricity Limited

Line Business Performance Measures

10 Average SAIDI targets for 2003/2007 years

  • Class B - Planned by Line Owners: 198
  • Class C - Unplanned by Line Owners: 120

11 The SAIDI for the total number of interruptions within each interruption class

Class Description 2002 2001 2000 1999
A Planned by Transpower 0 0 0 0
B Planned by Line Owners 131.53 172.62 218.41 147.88
C Unplanned by Line Owners 148.08 141.05 146.51 233.63
D Unplanned by Transpower 0 0 0.32 0
E Unplanned by ECNZ 0 0 0 0
F Unplanned by other generator 0 0 0 0
G Any Other Loss of Supply 0 0 0.54 0

12 The SAIFI for the total number of Interruptions

  • 2002: 1.77
  • 2001: 2.14
  • 2000: 3.11
  • 1999: 3.30

13 SAIFI Targets for 2002/2003

  • Class B - Planned by Line Owners: 0.72
  • Class C - Unplanned by Line Owners: 1.34

14 Average SAIFI targets for 2003/2007 years

  • Class B - Planned by Line Owners: 0.65
  • Class C - Unplanned by Line Owners: 1.28

15 The SAIFI for the total number of interruptions within each interruption class

Class Description 2002 2001 2000 1999
A Planned by Transpower 0 0 0 0
B Planned by Line Owners 0.43 0.71 0.95 0.91
C Unplanned by Line Owners 1.34 1.43 2.15 2.39
D Unplanned by Transpower 0 0 0.01 0
E Unplanned by ECNZ 0 0 0 0
F Unplanned by other generator 0 0 0 0
G Any Other Loss of Supply 0 0 0 0

16 The CAIDI for the total number of interruption

  • 2002: 157.7
  • 2001: 146.4
  • 2000: 117.0
  • 1999: 115.7

17 CAIDI targets for 2002/2003

  • Class B - Planned by Line Owners: 360
  • Class C - Unplanned by Line Owners: 110

18 Average CAIDI Target for 2003/2007 years

  • Class B - Planned by Line Owners: 304
  • Class C - Unplanned by Line Owners: 94

19 The CAIDI for the total number of interruptions within each interruption class

Class Description 2002 2001 2000 1999
A Planned by Transpower 0 0 0 0
B Planned by Line Owners 305 242 230 163.14
C Unplanned by Line Owners 110 99 68 97.68
D Unplanned by Transpower 0 0 27 0
E Unplanned by ECNZ 0 0 0 0
F Unplanned by other generator 0 0 0 0
G Any Other Loss of Supply 0 0 340 0


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 93


Gazette.govt.nz PDF NZ Gazette 2002, No 93





✨ LLM interpretation of page content

🏭 Line Business Performance Measures for Buller Electricity Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Performance Measures, Interruptions, Faults, SAIDI, SAIFI, CAIDI, Buller Electricity Limited