Energy Reliability Performance Measures




1412 NEW ZEALAND GAZETTE No. 51

3.3 RELIABILITY PERFORMANCE MEASURES (con’t)

b) The measure of unplanned interruptions directly resulting from unplanned interruptions of a transmission system calculated by the formula a/b where:

a = the sum obtained by adding together the number of customer-hours lost during each interruption; and

b = the total number of customers being supplied by means of the system.
System Unplanned interruption measure (resulting from transmission interruptions)
Jan01-Dec01
Alfriston -
Ashhurst -
Auckland Central -
Bruce McLaren -
Dannevirke -
Drury -
Feilding -
Foxton -
Hastings -
Hunua -
Kakariki -
Kairanga -
Kingseat -
Levin -
Longburn -
Mangaroa -
Mangatainoka -
Oroua Downs -
Pahiatua -
Palmerston North -
Pukekohe -
Ramarama -
Takapau -
Tuakau -
Waiuku -
Wellington -

PUBLISHED BY THE
DEPARTMENT OF INTERNAL AFFAIRS

The Department of Internal Affairs

PRINTED BY WICKLIFFE LIMITED

ISSN 0111-5650
Price $5.00 (inc. G.S.T.)




Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 51


Gazette.govt.nz PDF NZ Gazette 2002, No 51





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Efficiency, Gas Systems, Performance Measures, Statistics, Gas Conveyance, Customer Counts, Reliability, Interruptions