✨ Financial Performance Indicators




CENTRALINES LIMITED - LINES BUSINESS

PERFORMANCE INDICATORS

FOR THE YEARS ENDED 31 MARCH


Regulation 15 FINANCIAL PERFORMANCE MEASURES

2002 2001 2000 1999 1998
15 a Return on Funds -1.41% 2.82% 3.60% -0.04% 3.72%
15 b Return on Equity -0.66% 1.84% 2.40% 3.15% 3.75%
15 c Return on Investment -19.59% 1.44% 2.10% 3.28% 14.13%

15 EFFICIENCY PERFORMANCE INDICATORS

2002 2001 2000 1999 1998
15 a Direct Line Costs per Kilometre $574 $468 $551 $889 $479
15 a Indirect Line Costs per Customer $97 $125

Note: The 2001 value has been restated to exclude depreciation and interest income in the numerator


21.1 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES

2002 2001 2000 1999 1998
21 a Load Factor 30.41% 63.00% 68.00% 65.00% 65.00%
21 b Loss Ratio 7.39% 8.02% 8.50% 7.80% 9.70%
21 c Capacity Utilisation 58.36% 29.00% 26.00% 27.00% 28.00%

21.2 STATISTICS

System Length (km) 2002 2001 2000 1999 1998
21 a 33kV 91.0 91.0 91.0 91.0 91.0
11kV 1434.0 1435.0 1366.0 1364.0 1382.0
400V 91.0 86.0 86.0 85.6 84.8
Total 1,616.0 1,612.0 1,543.0 1,540.6 1,537.8
Total Length of Overhead System (km) 2002 2001 2000 1999 1998
21 b 33kV 90.0 90.0 90.0 90.0 90.0
11kV 1425.0 1428.0 1359.0 1357.0 1365.0
400V 65.2 67.8 66.6 66.8 66.6
Total 1,580.2 1,585.8 1,515.6 1,513.8 1,511.6
Total Length of Underground System (km) 2002 2001 2000 1999 1998
21 c 33kV 0.5 0.5 0.5 0.5 0.5
11kV 8.4 7.2 7.3 7.2 7.0
400V 22.7 20.5 19.5 19.1 18.2
Total 31.6 28.2 27.3 26.8 25.9

| 21 d Transformer Capacity (KVA) | 71,492 | 69,837 | 64,635| 63,993| 63,178|

| 21 e Maximum Demand (KW) |
Note: This maximum demand was the result of loss of metering pulses during the commissioning phase of the second transformer bank at Transpower's GXP. A walver was in place during this phase as a result.
| | 41,724*| 20,286 | 17,000| 17,000| 17,420|

| 21 f Total Electricity Supplied into Systems (before losses) Kwhr |
Note: Comparatives are for the total electricity supplied from the system after losses of electricity.
| | 111,117,752 | 102,341,989 | 93,369,416 | 89,547,354 | 89,343,000 |

| 21 g Electricity on behalf of other entities (after losses) Kwh |
| |
| Retailer 1 | 81,571,915 | 100,198,186 | 90,546,442 | 76,200,117 |
| Retailer 2 | 12,009,511 | 2,822,255 | 1,853,841 | 13,174,033|
| Retailer 3 | 1,532,778 | 829,106 | 655,073 | 173,204 |
| Retailer 4 | 7,038,269 | 7,397,053 | 109,947 |
| Retailer 5 | 113,799 | 117,673 | 104,114 |
| Retailer 6 | 687,278 | | |
| Total | 102,953,537|

Note: Comparative figures are for the total amount of electricity conveyed through the system before the losses of electricity.

| 21 h Total Customers (average for year) | 7,431 | 7,432 | 7,454 | 7,432 | 7,769 |


Regulation 22

22 Number of Faults per 100 circuit kilometre overhead
7 & 5 a 33kV
7 & 5 a 11kV
Total
Number of Faults per 100 circuit kilometre underground
6 & 5 a 33kV
6 & 5 a 11kV
Total
Percentage of Faults greater than or equal to 3 hours
4 a
4 b


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 132


Gazette.govt.nz PDF NZ Gazette 2002, No 132





✨ LLM interpretation of page content

🏭 Financial Performance Indicators for Centralines Limited (continued from previous page)

🏭 Trade, Customs & Industry
Financial Performance, Efficiency Indicators, Energy Delivery, Statistics, Centralines Limited