✨ Electricity Performance Statistics




3 SEPTEMBER

NEW ZEALAND GAZETTE

3455

18.6 Total Number Of Faults Per 100km Of Prescribed Voltage Underground Line

Nominal Voltage 2002 Powerco Number of Faults/100km 2001 Powerco Number of Faults/100km 2000 Powerco Number of Faults/100km 1999 Powerco Number of Faults/100km
110kV - - - -
33kV - - - -
22kV - - - -
11kV 4.25 3.29 4.92 2.78
6.6kV - - - -
3.3kV - - - -
Total 3.83 2.94 4.47 2.47

18.7 Total Number Of Faults Per 100km Of Prescribed Voltage Overhead Line

Nominal Voltage 2002 Powerco Number of Faults/100km 2001 Powerco Number of Faults/100km 2000 Powerco Number of Faults/100km 1999 Powerco Number of Faults/100km
110kV - - - -
33kV 4.17 3.59 - -
22kV 13.04 13.27 8.83 9.72
11kV 9.17 11.66 12.82 10.12
6.6kV 6.21 5.34 0.72 0.60
3.3kV - - - -
Total 8.64 10.67 10.62 8.57

18.8 SAIDI

Interruption Class 2002 Powerco SAIDI 2001 Powerco SAIDI 2000 Powerco SAIDI 1999 Powerco SAIDI
Class A - Transpower Planned 8.82 7.51 6.53 10.46
Class B - Distributor Planned 38.02 23.59 13.23 23.79
Class C - Distributor Unplanned 91.92 60.84 88.73 100.80
Class D - Transpower Unplanned 20.59 3.75 1.05 3.22
Class E - ECNZ Unplanned - - - -
Class F - Other Generator Unplanned - - - -
Class G - Other (Not in A to F) 0.23 - - -
Class H - Other Owner - - - -
Class I - Other Owner (Not in A - I) - - - -
Total 159.57 95.69 109.53 138.27

18.9 SAIDI - Targeted for the Following Financial Year

Interruption Class 2003 Powerco SAIDI
Class B - Distributor Planned 25
Class C - Distributor Unplanned 73
Interruption Class 2002 Powerco SAIDI 2001 Powerco SAIDI
Class B - Distributor Planned 25 13.23
Class C - Distributor Unplanned 75 88.73

18.10 - 18.11 SAIDI

Targeted for the Following Financial Year and Subsequent 4 Financial Years

Interruption Class 2003 Powerco SAIDI 2004-2007 Powerco SAIDI
Class B - Distributor Planned 25 25
Class C - Distributor Unplanned 73 73
Interruption Class 2002 Powerco SAIDI 2000 Powerco SAIDI 2001-2004 Powerco SAIDI
Class B - Distributor Planned 25 23 13
Class C - Distributor Unplanned 75 99 89


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 129


Gazette.govt.nz PDF NZ Gazette 2002, No 129





✨ LLM interpretation of page content

🌾 Disclosure of Performance Measures for Electricity (continued from previous page)

🌾 Primary Industries & Resources
Electricity, Performance Measures, Faults, Underground Lines, Overhead Lines, SAIDI, Powerco