✨ Electricity Reliability Performance




VECTOR Limited

Electricity Lines Business

Reliability Performance Measures To Be Disclosed By Lines Owners (Other Than Transpower) - continued

For the year ended 31 March 2002


FIRST SCHEDULE – PART 5 - CONTINUED

CAIDI

  1. The CAIDI for the total interruptions
2002 2001 2000 1999
53.89 49.00 52.08 65.45
  1. CAIDI targets for the following financial year
2003
(a) Planned (class B) 180.00
(b) Unplanned (class C) 49.30
  1. Average CAIDI targets
2007 2006 2005 2004 2003
(a) Planned (class B) 180.00 180.00 180.00 180.00 143.77
(b) Unplanned (class C) 43.50 44.50 45.50 46.42 55.54
  1. The CAIDI for the total interruptions within each interruption class
Class 2002 2001 2000 1999
A - - - -
B 107.55 176.15 180.48 196.15
C 64.24 49.36 54.29 64.59
D 20.38 8.00 16.00 15.89
E - - - -
F - - - -
G - - - -
H - - - -
I - - - -

Description of interruption classes as per The Electricity (Information Disclosure) Regulations 1999

Class Description
A Planned Transpower interruption
B Planned interruption by a line operator (other than Transpower)
C Unplanned interruption origination within the principal line owners works
D Unplanned Transpower interruption
E Unplanned interruption origination within the principal line owners works (generation)
F Unplanned interruption (as E above) by persons other than principal line owner (generation)
G Unplanned interruption caused by another line owner
H Planned interruption caused by another line owner
I Other (an interruption not referred to above)


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 124


Gazette.govt.nz PDF NZ Gazette 2002, No 124





✨ LLM interpretation of page content

🏭 Vector Limited Financial Statements (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Reliability Performance, CAIDI, Interruptions, Vector Limited