Reliability Performance Measures (Schedule 1, Part 5)

Para SAIDI Class Average SAIDI Targets 2003/07 SAIDI Targets 2003 Actual SAIDI 2002 Actual SAIDI 2001 Actual SAIDI 2000 Actual SAIDI 1999
8 SAIDI for total number of interruptions (= a/b) where - a = sum of interruption duration factors for all interruptions b = Total consumers 169.78 1,043.04 235.34 404.01
9, 10 SAIDI Targets (=a/b) Planned Interruptions Unplanned Interruptions where- Planned Interruptions (pi) a" = sum of interruption duration factors for all interruptions Unplanned Interruptions (ui) a" = sum of interruption duration factors for all interruptions b = Projected total consumers Class B Class C Class B Class C 40 124 49 165
1,033,049 3,213,353 1,261,946 4,249,410
25,956 25,754
11 SAIDI for total number of interruptions within each interruption class (= a/b) SAIDI for total of interruptions where - a = sum of interruption duration factors for all interruptions within the particular interruption class b = Total consumers Class A Class B Class C Class D Class A Class B Class C Class D 0.00 75.89 111.98 1.91 1.27 24.12 642.95 374.71 1.68 47.95 183.43 2.28 0.00 164.46 239.55 0.00
169.78 1,043.04 235.34 404.01
0 1,939,160 2,861,194 48,870 32,862 626,231 16,690,867 9,727,476 39,732 1,136,102 4,346,118 54,126 3,263,380 4,753,391 19,843
25,552 25,960 23,694


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 117


Gazette.govt.nz PDF NZ Gazette 2002, No 117





✨ LLM interpretation of page content

πŸ—οΈ Reliability Performance Measures (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Electricity, Reliability, Interruptions, Faults, Performance Measures, Statistics