✨ Energy Reliability Statistics




Regulation 22

Disclosure by line owners (other than Transpower) of reliability performance measures

1 Total number of interruptions:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions 2002 2001 2000 1999
Orion B Planned Shut downs 220 162 313 445
Orion C Unplanned Cuts 404 499 545 484
Transpower A Planned Shut downs 0 0 3 2
Transpower D Unplanned Cuts 2 3 1 0

Total: | | | 626 | 664 | 862 | 931 |

Disclosure Regulation classes E, F and G do not apply to Orion and consequently results are all zero.

2 & 3 Interruption targets:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions 2003 Average 2003 - 2007
Orion B Planned Shut downs 385 385
Orion C Unplanned Cuts 555 555

4 Proportion of Class C interruptions not restored within:

(a) 3 hours 15.35%

(b) 24 hours 0.25%

5(a) Faults per 100 circuit-km of electric line:

2002 2001 2000 1999
66kV 2.9 0.0 1.7 1.7
33kV 3.7 2.8 4.3 3.1
11kV 7.7 9.7 10.0 8.7
All 7.3 9.1 9.5 8.2

(b) & (c) Target number of faults per 100 circuit-km of electric line:

2003 Average 2003 - 2007
66kV 2.0 2.0
33kV 4.0 4.0
11kV 12.0 12.0
All 11.3 11.3


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 115


Gazette.govt.nz PDF NZ Gazette 2002, No 115





✨ LLM interpretation of page content

🌾 Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🌾 Primary Industries & Resources
Energy, Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, Line Circuit Lengths, Overhead Lines, Underground Lines, Statistics