β¨ Electricity Performance Metrics
19 AUGUST
NEW ZEALAND GAZETTE
2923
2002 | 2001 | 2000 | 1999
4 Fault Restoration Times (Class C) interruptions not restored within:
- 3 Hours: 32.68% | 20.21% | 4.88% | 7.80%
- 24 Hours: 0.65% | 0% | 0% | 1.30%
5 Number of faults per 100 km of prescribed voltage line
(a) Total number of faults
| 2002 | 2001 | 2000 | 1999 | |
|---|---|---|---|---|
| 66 kV | 3.8 | 6.5 | 6.3 | |
| 33 kV | 1.6 | 1.2 | 3.2 | 3.9 |
| 22 kV | 14.1 | 13.9 | 4.0 | 4.3 |
| 11 kV | 6.3 | 8.7 | 6.3 | 8.0 |
| Total | 5.9 | 7.5 | 5.1 | 7.2 |
(b) Target for (next year)
| Target | |
|---|---|
| 66 kV | 4.0 |
| 33 kV | 4.0 |
| 22 kV | 7.0 |
| 11 kV | 7.0 |
| Total | 5.4 |
(c) Average Target (5 years)
| Target | |
|---|---|
| 66 kV | 4.0 |
| 33 kV | 4.0 |
| 22 kV | 7.0 |
| 11 kV | 7.0 |
| Total | 5.4 |
6 The total number of faults per 100km of prescribed voltage underground line
| 2002 | 2001 | 2000 | 1999 | |
|---|---|---|---|---|
| 66 kV | 0 | 0 | 0 | |
| 33 kV | 0 | 0 | 0 | 0 |
| 22 kV | 0 | 0 | 0 | 0 |
| 11 kV | 0 | 5.2 | 3.0 | 1.6 |
| Total | 0 | 1.6 | 1.0 | 1.5 |
7 The total number of faults per 100km of prescribed voltage overhead line
| 2002 | 2001 | 2000 | 1999 | |
|---|---|---|---|---|
| 66 kV | 3.8 | 6.7 | 6.7 | 3.9 |
| 33 kV | 1.6 | 1.3 | 3.2 | |
| 22 kV | 14.2 | 14.0 | 4.0 | 4.3 |
| 11 kV | 6.6 | 8.9 | 6.4 | 8.2 |
| Total | 6.6 | 8.1 | 5.4 | 7.4 |
8 SAIDI for the total number of interruptions
| 2002 | 2001 | 2000 | 1999 |
|---|---|---|---|
| 228.56 | 130.88 | 146.72 | 197.38 |
9 SAIDI targets (next year)
- Class B - Planned by Line Owner: 136
- Class C - Unplanned by Line Owner: 68
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2002, No 108
Gazette.govt.nz —
NZ Gazette 2002, No 108
β¨ LLM interpretation of page content
ποΈ
Electricity Ashburton Limited Performance Measures
(continued from previous page)
ποΈ Infrastructure & Public WorksElectricity, Performance Measures, Fault Restoration, Fault Rates, SAIDI, Voltage Lines