✨ Electricity Statistics




16 AUGUST

NEW ZEALAND GAZETTE

2835

Statistics Nominal Voltage 2002 2001 2000 1999
(a) System Length (Total) (kms)
110kV 17.00 17.00 0 0
66kV 0 0 0 0
50kV 0 0 0 0
33kV 151.24 151.00 169.41 169.00
22kV 190.57 172.00 89.70 78.00
11kV 1,618.15 1,599.00 1,722.40 1,708.00
6.6kV 0 0 0 0
3.3kV 0 0 0 0
230/400 V 1,408.5 1,408.00 1,158.30 1,343.00
Other 0 0 0 0
Total 3,385.46 3,347.00 3,139.82 3,298.00

| (b) Circuit Length (Overhead) (kms) | | | | | |
| 110kV | | 17.00 | 17.00 | 0 | 0 |
| 66kV | | 0 | 0 | 0 | 0 |
| 50kV | | 0 | 0 | 0 | 0 |
| 33kV | | 150.50 | 151.00 | 169.41 | 169.00 |
| 22kV | | 140.63 | 126.00 | 88.00 | 77.00 |
| 11kV | | 1,559.80 | 1,541.00 | 1,631.00 | 1,624.00 |
| 6.6kV | | 0 | 0 | 0 | 0 |
| 3.3kV | | 0 | 0 | 0 | 0 |
| 230/400 V | | 1,117.00 | 1,120.00 | 985.60 | 1,185.00 |
| Other | | 0 | 0 | 0 | 0 |
| Total | | 2,984.93 | 2,955.00 | 2,874.01 | 3,055.00 |

| (c) Circuit Length (Underground) (kms) | | | | | |
| 110kV | | 0 | 0 | 0 | 0 |
| 66kV | | 0 | 0 | 0 | 0 |
| 50kV | | 0 | 0 | 0 | 0 |
| 33kV | | 0.74 | 0 | 0 | 0 |
| 22kV | | 49.95 | 46.00 | 1.70 | 1.00 |
| 11kV | | 58.35 | 58.00 | 91.40 | 84.00 |
| 6.6kV | | 0 | 0 | 0 | 0 |
| 3.3kV | | 0 | 0 | 0 | 0 |
| 230/400 V | | 291.50 | 288.00 | 172.70 | 158.00 |
| Other | | 0 | 0 | 0 | 0 |
| Total | | 400.54 | 392.00 | 265.80 | 243.00 |

| (d) Transformer Capacity (kVA) | | 237,730 | 229,975 | 231,026 | 217,981 |
| (e) Maximum Demand (kWh) | | 85,808 | 77,800 | 75,146 | 74,338 |
| (f) Total Electricity Entering the System (before losses of electricity) in kilowatt hours | | 418,091,000 | 409,297,000 | 397,735,000 | 382,604,000 |



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 104


Gazette.govt.nz PDF NZ Gazette 2002, No 104





✨ LLM interpretation of page content

🏭 Counties Power Limited Statement of Financial Notes (continued from previous page)

🏭 Trade, Customs & Industry
2 August 2002
Electricity, Financial Statements, Revenue, Operating Expenditure, Line Business, Accounting, Related Party Transactions, Audit Opinion, Performance Measures, ODV Reconciliation, Time-Weighted Averages, Load Factor, Loss Ratio, Capacity Utilisation

πŸ—οΈ Electricity Statistics for Counties Power Limited

πŸ—οΈ Infrastructure & Public Works
Electricity, Statistics, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Entering System