β¨ Electricity Supply Statistics
BULLER ELECTRICITY LIMITED β LINE BUSINESS
Disclosure of reliability performance measures under regulation 22 of the Electricity (Information Disclosure) Regulations 1999 as amended by the Electricity (Information Disclosure) Amendment Regulations 2000.
- Total Number of Interruptions
| Class | Description | 2001 | 2000 | 1999 | 1998 |
|---|---|---|---|---|---|
| Class A | Planned by Transpower | 0 | 0 | 0 | 0 |
| Class B | Planned by Line Owners | 21 | 33 | 51 | 36 |
| Class C | Unplanned by Line Owners | 45 | 58 | 56 | 97 |
| Class D | Unplanned by Transpower | 0 | 1 | 0 | 1 |
| Class E | Unplanned by ECNZ | 0 | 0 | 0 | 0 |
| Class F | Unplanned by other generation | 0 | 0 | 0 | 0 |
| Class G | Any Other Loss of Supply | 0 | 1 | 0 | 0 |
| Total | 66 | 93 | 107 | 134 |
- Interruption Targets for 2001/2002
- Class B - Planned by Line Owners: 45
- Class C - Unplanned by Line Owners: 65
- Average Interruption Targets for 2002/2006 to 2004/2005 years
| Class | 2004/2005 | 2003/2004 | 2002/2003 | 1998/2002 |
|---|---|---|---|---|
| Class B - Planned by Line Owners | 45 | 45 | 45 | 41 |
| Class C - Unplanned by Line Owners | 65 | 65 | 65 | 65 |
-
Proportion of Class C Interruptions not restored within:
-
(=a/b*100)
-
3 Hours
- a = number of interruptions not restored within 3: 9
- b = Total number of Class C interruptions: 45
- 20%
-
24 Hours
- a = number of interruptions not restored within 24: 0
- b = Total number of Class C interruptions: 45
- 0%
-
-
(a) The total number of faults per 100 circuit kilometres of prescribed voltage electric line
Voltage 2001 2000 1999 1998 11kV 13 17 24.32 29.95 33kV 1 2 6 0 (b) Target for 2001/2002 year
Voltage Target 11kV 15 33kV 2 (c) Average Target for 2002/2006 years
Voltage Target 11kV 12 33kV 12 -
The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line
Voltage 2001 11kV 23 (Note: data for years 2000, 1999, and 1998 not available or zero in source document.)
-
The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line
Voltage 2001 2000 1999 1998 33kV 1 2 6 30.13 11kV 12 16 14 2.70 -
The SAIDI for the total number of interruptions
2001 2000 1999 1998 313.66 365.88 381.50 369.80 -
SAIDI targets for 2001/2002
- Class B - Planned by Line Owners: 188
- Class C - Unplanned by Line Owners: 141
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2001, No 99
Gazette.govt.nz —
NZ Gazette 2001, No 99
β¨ LLM interpretation of page content
π
Buller Electricity Limited - Electricity Supply Statistics
(continued from previous page)
π Trade, Customs & IndustryElectricity Supply, Interruptions, Faults, SAIDI, Targets, Reliability Performance