✨ Energy Company Performance Statistics




TOP ENERGY LIMITED

Performance Measures and Statistics

For the Year Ended 31 March 2001

Regulation 25

Reliability Performance Measures

i. Total number of interruptions and breakdowns by interruption class
Class Type of Interruption 5 Yr Average Target 2002 2001 2000 1999 1998
A Planned - Transpower 0 No 2 No 0 No 0 No
B Planned - Top Energy 220 230 218 295 278 363
C Unplanned - Top Energy 206 220 235 192 250 133
D Unplanned - Transpower 0 7 0 0
E Unplanned - Embedded Generation 0 0 0 0
F Unplanned - Other Generation 0 0 0 0
G Unplanned - Another Line owner 0 0 0 0
H Planned - Another Line owner 0 0 0 0
I Any other interruption 0 0 0 0
Total - All interruptions 453 499 535 496

Class C Interruptions not restored:

  • a Within 3 hours: 27%
  • b Within 24 hours: 0%
ii. Number of faults per 100 circuit kms
Line Voltage Total Underground Overhead
2001 2000 1999 1998 2001 2000 1999 1998 2001
-------------- ------- ------ ------ ------ ------- ------ ------ ------ -------
100kV
66kV
33kV 4.08 3.67 4.18 4.18 0 0 0 0 4.08
11kV 7.34 5.86 7.75 3.99 1.67 1.86 0 0 7.25
6.6kV
3.3kV
Total 6.92 5.7 7.49 4.00 1.67 1.86 0 0 7.01
Target Faults: 5 Yr Average Target 2002
33kV 3.8 3.8
11kV 5.9 5.9
Total 5.7 5.8
----------------- --------------- -------------
Underground
----------------- --------------- -------------
33kV 0 0
11kV 0.7 1
Total 0.7 1
----------------- --------------- -------------
Overhead
----------------- --------------- -------------
33kV 3.8 3.8
11kV 5.9 5.9
Total 5.8 5.8
iii. Breakdown of statistics by interruption class
Class Type of Interruption SAIDI (Minutes) SAIFI (Interruptions) CAIDI (Minutes)
2001 2000 1999 1998 2001
------------------------------------- ------- ------ ------- ------- ------
A Planned - Transpower 0 35 0 0 0
B Planned - Top Energy 83 185 163 189 0.6
C Unplanned - Top Energy 246 275 574 243 4.7
D Unplanned - Transpower 0 0 391 0 0
E Unplanned - Embedded Generation 0 0 0 0 0
F Unplanned - Other Generation 0 0 0 0 0
G Unplanned - Another Line owner 0 0 0 0 0
H Planned - Another Line owner 0 0 0 0 0
I Any other interruption 0 0 0 0 0
Total - All interruptions 329 495 1128 432 5.3
Targets: 5 Yr Average Target 2001
B Planned - Top Energy 100 100
C Unplanned - Top Energy 250 250
SAIFI
--------------------------------------- -------------- -------------
B Planned - Top Energy 6.0 1.0
C Unplanned - Top Energy 4.4 5.0
CAIDI
--------------------------------------- -------------- -------------
B Planned - Top Energy 166 100
C Unplanned - Top Energy 56 50


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 98


Gazette.govt.nz PDF NZ Gazette 2001, No 98





✨ LLM interpretation of page content

🌾 Top Energy Limited Performance Measures and Statistics for the Year Ended 31 March 2001 (continued from previous page)

🌾 Primary Industries & Resources
Energy, Electricity, Performance Measures, Statistics, Reliability, Faults