✨ Performance Measures for Waipa Networks Limited




17 AUGUST

NEW ZEALAND GAZETTE

2363

WAIPA NETWORKS LIMITED - LINES BUSINESS

2001 2000 1999 1998
16 The CAIDI for the total number of interruption 69 75 75

17 CAIDI targets for 2001 / 2002

Class B - Planned - by Waipa Networks 211

Class C - Unplanned - by Waipa Networks 50

18 Average CAIDI Target for 2001 / 2002 to 2005 / 2006 years

Class B - Planned - by Waipa Networks 211

Class C - Unplanned - by Waipa Networks 45

19 The CAIDI for the total number of interruptions within each interruption class

Class Description 2001 2000 1999 1998
A Planned - by Transpower 0 0 0 0
B Planned - by Waipa Networks 215 150 140 163
C Unplanned - by Waipa Networks 53 90 61 69
D Unplanned - by Transpower 46 6 0 3
E Unplanned - by Line Owner generation 0 0 0 0
F Unplanned - by other generation 0 0 0 0
G Unplanned - by another line owner 42 0 0 0
H Planned - by another line owner 0 0 0 0
I Any other loss of supply 0 0 0 0


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 91


Gazette.govt.nz PDF NZ Gazette 2001, No 91





✨ LLM interpretation of page content

🏭 Performance Measures for Waipa Networks Limited (continued from previous page)

🏭 Trade, Customs & Industry
Performance Measures, Financial, Efficiency, Electricity, Waipa Networks Limited, Statistics, System Length, Transformer Capacity, Maximum Demand, Electricity Supply, Customers, SAIDI, SAIFI, Interruptions, Targets