Energy Delivery Efficiency Performance Measures




3.2 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

For the 9 months ended 31 December 2000

Schedule 1 – PART 3

1 Energy Delivery Efficiency Performance Measures

a) Load Factor

As calculated by the formula a/(9 x b) expressed as a percentage, where:

  • a = the amount of gas entering the system or systems during the financial year; and
  • b = the maximum monthly amount of gas entering the system or systems.
System Load Factor (%) Apr00-Dec00¹
Alfriston 60.56
Ashhurst 75.39
Auckland Central 85.04
Bruce McLaren 81.59
Dannevirke 85.79
Drury 68.98
Feilding 76.65
Foxton 66.08
Hastings 87.81
Hunua 87.13
Kakariki 83.16
Kairaga 20.50
Kingseat 63.03
Levin 78.66
Longburn 52.73
Mangaroa 67.51
Mangatainoka 86.62
Oroua Downs 18.91
Pahiatua 68.15
Palmerston North 75.78
Pukekohe 78.23
Ramarama 71.80
Takapau 73.32
Tuakau 75.28
Waimauku 6.00
Waikuku 85.44
Wellington 76.02

¹ As there is only 9 months data (1Apr00-31Dec00) for the financial year, the formula a/(9 x b) is used.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 53


Gazette.govt.nz PDF NZ Gazette 2001, No 53





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery, Efficiency Performance, Load Factor, Gas Systems