Efficiency Performance Measures (Schedule 1, Part 3)

(a)

2001 2000 1999 1998
Direct line costs per kilometre 1.037 1.297 1.472 1.326
Direct expenditure 6,500,929 4,535,030 4,159,959 3,749,932
System length 3,538.02 3,495.52 2,827.00 2,827.00

(b)

2001 2000 1999 1998
Indirect line costs per consumer 52 72 94 112
Indirect expenditure 1,355,848 1,699,925 1,864,051 2,223,005
Total consumers 26,128 23,694 19,843 19,797

Energy Delivery Efficiency Performance Measures (Schedule 1, Part 4)

(a)

Load Factor (= [a/bc]*100/1) 2001 2000 1999 1998
57.99% 56.59% 59.25% 59.24%

Where -

  • a = Kwh of electricity entering system during the financial year | 289,321,000 | 269,881,692 | 223,221,000 | 224,965,100 |

    (this figure should be same as the total for (g) from Statistics)

  • b = Maximum Demand | 56,950 | 54,446 | 43,010 | 43,354 |

  • c = Total number of hours in financial year | 8,760 | 8,760 | 8,760 | 8,760 |

(b)

Loss Ratio (= [a/b]*100/1) 2001 2000 1999 1998
8.51% 6.18% 7.26% 7.29%

Where -

  • a = losses in electricity in kWh | 24,612,917 | 16,679,992 | 16,205,845 | 16,399,956 |

    (this figure should be the difference between (f) and (g) from Statistics)

  • b = Kwh of electricity entering system during the financial year | 289,321,000 | 269,881,692 | 223,221,000 | 224,965,100 |

(c)

Capacity Utilisation (= [a/b]*100/1) 2001 2000 1999 1998
27.12% 28.47% 26.45% 26.91%

Where -

  • a = Maximum Demand | 56,950 | 54,446 | 43,010 | 43,354 |
  • b = Transformer Capacity | 209,991 | 191,216 | 162,619 | 161,094 |


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 115


Gazette.govt.nz PDF NZ Gazette 2001, No 115





✨ LLM interpretation of page content

πŸ’° Efficiency Performance Measures (continued from previous page)

πŸ’° Finance & Revenue
Direct line costs, Direct expenditure, System length, Indirect line costs, Indirect expenditure, Total consumers

πŸ’° Energy Delivery Efficiency Performance Measures

πŸ’° Finance & Revenue
Load Factor, Kwh of electricity, Maximum Demand, Loss Ratio, Capacity Utilisation