Electricity Statistics




NEW ZEALAND GAZETTE

No. 111

Dunedin Area Only

2001 2000 1999 1998
(e) System length – underground
Circuit kilometres 33 kV 91 94 75 75
Circuit kilometres 11 kV 220 228 21 21
Circuit kilometres 6.6 kV 220 224 232 231
Circuit kilometres 400 V 393 341 99 99
Circuit kilometres 600 V DC 3 3 3 3
Total Underground 927 891 430 429

| (d) Transformer capacity (kVA) | 708,484 | 686,994 | 483,005 | 483,000 |

| (e) Maximum demand (kW) | 252,775 | 240,400 | 176,000 | 171,000 |

| (f) Total electricity supplied after losses from the system (kWh) | 1,159,709,552 | 1,118,117,100 | 817,580,703 | 835,582,607 |

| (g) Electricity conveyed before losses for each party (kWh) | | | | |
| Party 1 | 651,749,697 | 742,100,150 | 197,711,000 | - |
| Party 2 | 329,715,687 | 297,082,494 | 428,288 | - |
| Party 3 | 98,364,356 | 15,426,021 | - | - |
| Party 4 | 71,907,870 | 96,179,809 | 47,892,265 | 8,283,387 |
| Party 5 | 26,558,721 | 20,487,800 | - | - |
| Party 6 | 18,161,425 | 8,353,689 | 3,194,052 | 5,417,336 |
| Party 7 | 17,459,278 | 1,072,785 | - | - |
| Party 8 | 13,358,739 | 4,984,807 | - | - |
| Party 9 | 2,883,939 | 1,506,547 | - | - |
| Party 10 | 2,971,843 | 2,794,080 | - | - |
| Party 11 | 478,005 | - | - | - |
| Party 12 | 171,272 | - | - | - |
| Party 13 | - | - | 573,288,000| 811,095,000|
| Party 14 | - | - | 20,783,600 | 17,953,691 |
| Party 15 | - | - | 17,259,149 | 40,509,996 |
| Party 16 | - | - | 4,308,025 | 4,260,979 |
| Party 17 | - | - | 3,254,180 | - |
| Total | 1,233,780,832 | 1,188,915,397 | 868,118,559 | 887,520,389 |

| (h) Total consumers | 70,208 | 69,494 | 50,059 | 49,904 |

Reliability performance measures (Regulation 22)

  1. Total number of interruptions
Class 2001 2000 1999 1998
Class A – planned by Transpower 0 0 0 0
Class B – planned by line owners 209 136 93 113
Class C – unplanned by line owners 407 285 129 131
Class D – unplanned by Transpower 1 3 0 0
Class E – unplanned by embedded generation 0 0 0 0
Class F – unplanned by generation on other networks 0 0 0 0
Class G – unplanned by other line owner 0 0 0 0
Class H – planned by another line owner 0 0 0 0
Class I – any other loss of supply 0 0 0 0
  1. No of interruption targets for next financial year
Class 2001 2000 1999
Class B – planned by line owners 200 120 100
Class C – unplanned by line owners 350 280 130


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 111


Gazette.govt.nz PDF NZ Gazette 2001, No 111





✨ LLM interpretation of page content

🏗️ Electricity System Statistics for Dunedin Area

🏗️ Infrastructure & Public Works
Electricity, System Length, Transformer Capacity, Maximum Demand, Electricity Supplied, Consumers, Reliability Performance, Dunedin