β¨ Reliability Performance Measures
2704
NEW ZEALAND GAZETTE
No. 105
VECTOR Limited
Electricity Lines Business
RELIABILITY PERFORMANCE MEASURES TO BE DISCLOSED BY LINE OWNERS
(OTHER THAN TRANSPOWER)
FOR THE YEAR ENDED 31 MARCH 2001
FIRST SCHEDULE - PART 5 continued
CAIDI
- The CAIDI for the total interruptions
2001 2000 1999 1998
49.00 52.08 65.45 89.37
- CAIDI targets for following financial year
2006 2005 2004 2003 2002
(a) Planned (Class B) 180.00
(b) Unplanned (Class C) 49.30
- Average CAIDI targets
2006 2005 2004 2003 2002
(a) Planned (Class B) 180.00 180.00 180.00 180.00 178.08
(b) Unplanned (Class C) 49.30 49.30 49.30 49.30 49.33
-
The CAIDI for the total interruptions within each interruption class
2001 2000 1999 1998Class A - - - -
Class B 176.15 180.48 196.15 239.37
Class C 49.36 54.29 64.59 75.22
Class D 8.00 16.00 15.89 -
Class E - - - -
Class F - - - -
Class G - - - -
Class H - - - -
Class I - - - -
Description of interruption classes as per 1999 Disclosure Regulations
Class A Planned Transpower interruption
Class B Planned interruption by a line operator (other than Transpower)
Class C Unplanned interruption originating within the principal line owners works
Class D Unplanned Transpower interruption
Class E Unplanned interruption originating within the principal line owners works (generation)
Class F Unplanned interruption (as E above) by persons other than principal line owner (generation)
Class G Unplanned interruption caused by another line owner
Class H Planned interruption caused by another line owner
Class I Other (an interruption not referred to above)
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2001, No 105
Gazette.govt.nz —
NZ Gazette 2001, No 105
β¨ LLM interpretation of page content
π
Vector Limited Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryReliability, Performance Measures, Electricity, Vector Limited, CAIDI, Interruptions