✨ Electricity Performance Statistics




21 AUGUST
NEW ZEALAND GAZETTE
2475

8, 11,
12, 15,
16, 19 SAIDI, SAIFI and CAIDI by interruption class and in total for 1997/98:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions SAIDI (minutes per connected customer) SAIFI (interruptions per connected customer) CAIDI (minutes per customer interrupted)
Orion B Planned Shutdowns 28.8 0.172 167.5
C Unplanned Cuts 52.8 0.838 63.0
Subtotal 81.6 1.010 80.7
Transpower A Planned Shutdowns 0.7 0.004 187.2
D Unplanned Cuts 0.0 0.000 0.0
Subtotal 0.7 0.004 187.2
TOTAL 82.3 1.014 81.1

Disclosure Regulation classes E, F and G do not apply to Orion and consequently the results are all zero.

Note that these are Orion's overall reliability performance indices. Refer to Orion's 1999 Annual Report for the results by urban and rural areas.

9, 13
& 17 SAIDI, SAIFI and CAIDI targets for the following financial year:

Network Owner Disclosure Regulation Class Classification of Interruptions SAIDI TARGET 2001 SAIFI TARGET 2001 CAIDI TARGET 2001
Orion B Planned Shutdowns 10.0 0.100 100.0
C Unplanned Cuts 65.0 1.000 65.0

10, 14
& 18 SAIDI, SAIFI and CAIDI targets:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions SAIDI AVERAGE TARGET 2001 - 2005 SAIFI AVERAGE TARGET 2001 - 2005 CAIDI AVERAGE TARGET 2001 - 2005
Orion B Planned Shutdowns 9.0 0.090 100.0
C Unplanned Cuts 60.0 0.906 66.3


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2000, No 98


Gazette.govt.nz PDF NZ Gazette 2000, No 98





✨ LLM interpretation of page content

πŸ’° Disclosure of financial and efficiency performance measures by line owners (continued from previous page)

πŸ’° Finance & Revenue
Energy efficiency, Performance measures, Electricity, Statistics, Line owners, Reliability, Interruptions, Faults, SAIDI, SAIFI, CAIDI