✨ Electricity Industry Statistics




2366 NEW ZEALAND GAZETTE No. 94

(c) Underground Line Length

Nominal Voltage 2000 Powerco U/G Line Length (km) 1999 Powerco U/G Line Length (km) 1998 Powerco U/G Line Length (km) 1997 Powerco U/G Line Length (km)
110 kV
33kV 16.16 15.43 13.74 9.68
22kV 0.27 0.23 0.19 0.19
11kV 223.57 215.78 169.53 163.68
6.6kV 5.92 11.84 11.84 17.36
230/400V 460.03 489.42 407.54 368.68
Total 705.95 732.69 602.84 559.59

(d) Transformer Capacity (kVA)

2000 Powerco 1999 Powerco 1998 Powerco 1997 Powerco
831,041 831,536 639,581 568,319

(e) Maximum Demand (kW)

2000 Powerco 1999 Powerco 1998 Powerco 1997 Powerco
243,335 234,050 196,000 177,311

(f) Total Electricity Supplied From System (kWh)

2000 Powerco 1999 Powerco 1998 Powerco 1997 Powerco
1,348,358,790 1,377,340,529 1,019,475,673 849,103,244

(g) Total Electricity Conveyed Through System On Behalf Of Other Electricity Retailers (kWh)

Powerco is unable to provide an accurate breakdown of the purchases by retailer as this information has either not been provided by retailers or there is doubt over the accuracy of that information. Without the ability to have complete data from retailers, Powerco is unable to reconcile this information and therefore assure the accuracy of this disclosure. A disclosure of this information will be made when it becomes available to Powerco.

2000 Powerco 1999 Powerco 1998 Powerco 1997 Powerco
1,348,358,790 77,456,468 2,492,834 17,821,943

(h) Total Customers

2000 Powerco
106,525
1999 Powerco
------------ --------------
104,370
1998 Powerco
------------ --------------
84,373
1997 Powerco
------------ --------------
71,730


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2000, No 94


Gazette.govt.nz PDF NZ Gazette 2000, No 94





✨ LLM interpretation of page content

🏭 Disclosure of Performance Measures Pursuant to Regulation 21 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1999 (continued from previous page)

🏭 Trade, Customs & Industry
Performance Measures, Electricity, Underground Line Length, Transformer Capacity, Maximum Demand, Electricity Supplied, Customers