✨ Energy Performance Statistics




NEW ZEALAND GAZETTE

18 AUGUST

2337

TOP ENERGY LIMITED

Performance Measures and Statistics

For the Year Ended 31 March 2000

Regulation 22

Reliability Performance Measures

i. Total number of interruptions and breakdowns by interruption class

Class Type of Interruption 5 Yr Average Target 2001 2000 No 1999 No 1998 No 1997 No
A Planned - Transpower 350 320 2 0 0
B Planned - Top Energy 295 278 363
C Unplanned - Top Energy 160 220 192 250 133
D Unplanned - Transpower 0 7 0
E Unplanned - Embedded Generation 0 0 0
F Unplanned - Other Generation 0 0 0
G Unplanned - Another Line owner 0 0 0
H Planned - Another Line owner 0 0 0
I Any other interruption 0 0 0
Total - All interruptions 489 535 496 569

Class C Interruptions not restored:

  • a. Within 3 hours: 10%
  • b. Within 24 hours: 0%

ii. Number of faults per 100 circuit kms

Line Voltage Total Underground Overhead
2000 1999 1998 1997 2000 1999 1998
100kV
66kV
33kV 3.67 4.18* 4.18* 2.93 0 3.67 4.18*
11kV 5.86 7.75* 3.99* 4.52 1.86 0 5.93
6.6kV 0 391 75 0
3.3kV
Total 5.7 **7.49*** **4.00*** 4.40 1.86 0 5.77
Target Faults: 5 Yr Average Target 2001
33kV 3.0 3.0
11kV 4.3 4.5
Total 4.0 4.4

iii. Breakdown of statistics by interruption class

Class Type of Interruption SAIDI (Minutes) SAIFI (Interruptions) CAIDI (Minutes)
2000 1999 1998
A Planned - Transpower 35 0 0
B Planned - Top Energy 185 163 189
C Unplanned - Top Energy 275 574 243
D Unplanned - Transpower 0 391 75
E Unplanned - Embedded Generation 0 0 0
F Unplanned - Other Generation 0 0 0
G Unplanned - Another Line owner 0 0 0
H Planned - Another Line owner 0 0 0
I Any other interruption 0 0 0
Total - All interruptions 495 1128 432
Targets: SAIDI (5 Yr Average) SAIDI (Target 2001) SAIFI (5 Yr Average) SAIFI (Target 2001) CAIDI (5 Yr Average) CAIDI (Target 2001)
B Planned 175 3.5 1.5 50 120
C Unplanned 385 7.0 7.0 55 55
  • Denotes a revised comparative


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2000, No 93


Gazette.govt.nz PDF NZ Gazette 2000, No 93





✨ LLM interpretation of page content

🏭 Top Energy Limited Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Performance, Reliability Measures, Fault Statistics, Interruption Classes, SAIDI, SAIFI, CAIDI