Reliability Performance Measures
i. Total number of interruptions and breakdowns by interruption class
| Class | Type of Interruption | 5 Yr Average | Target 2001 | 2000 No | 1999 No | 1998 No | 1997 No |
|---|---|---|---|---|---|---|---|
| A | Planned - Transpower | 350 | 320 | 2 | 0 | 0 | |
| B | Planned - Top Energy | 295 | 278 | 363 | |||
| C | Unplanned - Top Energy | 160 | 220 | 192 | 250 | 133 | |
| D | Unplanned - Transpower | 0 | 7 | 0 | |||
| E | Unplanned - Embedded Generation | 0 | 0 | 0 | |||
| F | Unplanned - Other Generation | 0 | 0 | 0 | |||
| G | Unplanned - Another Line owner | 0 | 0 | 0 | |||
| H | Planned - Another Line owner | 0 | 0 | 0 | |||
| I | Any other interruption | 0 | 0 | 0 | |||
| Total - All interruptions | 489 | 535 | 496 | 569 |
Class C Interruptions not restored:
- a. Within 3 hours: 10%
- b. Within 24 hours: 0%
ii. Number of faults per 100 circuit kms
| Line Voltage | Total | Underground | Overhead | ||||
|---|---|---|---|---|---|---|---|
| 2000 | 1999 | 1998 | 1997 | 2000 | 1999 | 1998 | |
| 100kV | |||||||
| 66kV | |||||||
| 33kV | 3.67 | 4.18* | 4.18* | 2.93 | 0 | 3.67 | 4.18* |
| 11kV | 5.86 | 7.75* | 3.99* | 4.52 | 1.86 | 0 | 5.93 |
| 6.6kV | 0 | 391 | 75 | 0 | |||
| 3.3kV | |||||||
| Total | 5.7 | **7.49*** | **4.00*** | 4.40 | 1.86 | 0 | 5.77 |
| Target Faults: | 5 Yr Average | Target 2001 |
|---|---|---|
| 33kV | 3.0 | 3.0 |
| 11kV | 4.3 | 4.5 |
| Total | 4.0 | 4.4 |
iii. Breakdown of statistics by interruption class
| Class | Type of Interruption | SAIDI (Minutes) | SAIFI (Interruptions) | CAIDI (Minutes) |
|---|---|---|---|---|
| 2000 | 1999 | 1998 | ||
| A | Planned - Transpower | 35 | 0 | 0 |
| B | Planned - Top Energy | 185 | 163 | 189 |
| C | Unplanned - Top Energy | 275 | 574 | 243 |
| D | Unplanned - Transpower | 0 | 391 | 75 |
| E | Unplanned - Embedded Generation | 0 | 0 | 0 |
| F | Unplanned - Other Generation | 0 | 0 | 0 |
| G | Unplanned - Another Line owner | 0 | 0 | 0 |
| H | Planned - Another Line owner | 0 | 0 | 0 |
| I | Any other interruption | 0 | 0 | 0 |
| Total - All interruptions | 495 | 1128 | 432 |
| Targets: | SAIDI (5 Yr Average) | SAIDI (Target 2001) | SAIFI (5 Yr Average) | SAIFI (Target 2001) | CAIDI (5 Yr Average) | CAIDI (Target 2001) |
|---|---|---|---|---|---|---|
| B Planned | 175 | 3.5 | 1.5 | 50 | 120 | |
| C Unplanned | 385 | 7.0 | 7.0 | 55 | 55 |
- Denotes a revised comparative
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2000, No 93
Gazette.govt.nz —
NZ Gazette 2000, No 93
β¨ LLM interpretation of page content
π
Top Energy Limited Performance Measures and Statistics
(continued from previous page)
π Trade, Customs & IndustryEnergy Performance, Reliability Measures, Fault Statistics, Interruption Classes, SAIDI, SAIFI, CAIDI