✨ Performance Measures and Statistics




1244 NEW ZEALAND GAZETTE No. 57

TRANSALTA NEW ZEALAND LIMITED

Performance Measures and Statistics (Continued)

For the Year Ended 31 March 1999

Regulation 18

  1. Reliability Performance Measures
31-Mar-99 31-Mar-98 31-Mar-97
Unplanned interruptions in transmission system N/A N/A N/A
Unplanned interruptions in distribution system (other than as below) 0.44 0.16 Nil
Unplanned interruptions in distribution system (resulting from interruption of transmission system) Nil Nil Nil

The information disclosed in the 1998 Information Disclosure package issued by TransAlta New Zealand Limited has been prepared solely for the purposes of the Gas (Information Disclosure) Regulations 1997.

The information should not be used for any other purpose than that intended under the regulations.

LexisNexis



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2000, No 57


Gazette.govt.nz PDF NZ Gazette 2000, No 57





✨ LLM interpretation of page content

🏭 Performance Measures and Statistics for the Year Ended 31 March 1999 (continued from previous page)

🏭 Trade, Customs & Industry
Performance Measures, Statistics, Gas (Information Disclosure) Regulations 1997, TransAlta New Zealand Limited