Alpine Energy Limited Financial Report




NEW ZEALAND GAZETTE

No. 115

Alpine Energy Limited (Lines)

Annual Valuation Reconciliation Report

$'000

System Fixed Assets at ODV (start of period)
69,723

Add System Fixed Assets acquired during the period at ODV
2,120

Less System Fixed Assets disposed of during the period at ODV
(732)

Less depreciation on System Fixed Assets at ODV
(2,744)

Add revaluations of System Fixed Assets
0

Gives System Fixed Assets at ODV (end of period)
68,367

Valuation of the Network Reticulation System

Valuation of the Network Reticulation System is at net current value on an existing use basis, as at 31 March 1999, and was conducted by Mr Bruce Gemmell, partner of the firm KPMG, Christchurch.

Explanation of Terms

General

km
kilometres

kV
kilovolts

kVA
kilovolt amperes

kW
kilowatts

kWh
kilowatt hours (also referred to as units)

ODV
Optimised Deprival Valuation

GXP
Grid Exit Point

Network Statistics

Generation
Electricity provided by embedded generation from Opuha Dam.

Import
Electricity supplied to the Network from Transpower’s Network.

Export
Electricity supplied to Transpower’s Network from the Network at Albury GXP due to a surplus of embedded generation over demand.

Reliability and Performance Measures

Class A
planned interruptions by Transpower.

Class B
planned interruptions by Alpine Energy.

Class C
unplanned interruptions by Alpine Energy.

Class D
unplanned interruptions by Transpower.

Class E
unplanned interruptions on ‘generation’ lines used by Alpine Energy.

Class F
unplanned interruptions on ‘generation’ lines used by another line owner.

Class G
unplanned interruptions caused by another line owner.

Class H
planned interruptions caused by another line owner.

Class I
an interruption not referred to in Classes A to H.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2000, No 115


Gazette.govt.nz PDF NZ Gazette 2000, No 115





✨ LLM interpretation of page content

🏗️ Alpine Energy Limited Financial Derivation Table (continued from previous page)

🏗️ Infrastructure & Public Works
Financial Data, Operating Surplus, Depreciation, Reconciliations, Performance Measures
  • Bruce Gemmell, Conducted valuation of Network Reticulation System