β¨ Energy Network Statistics
30 AUGUST NEW ZEALAND GAZETTE 2897
Alpine Energy Limited (Lines)
Reliability and Performance Measures - Interruptions and Faults - 31 March 2000
Interruptions
| Class | 2001/05 (Average Target) | 2001 (Target) | 2000 | 1999 | 1998 | 1997 |
|---|---|---|---|---|---|---|
| Number of Interruptions | ||||||
| Planned Interruptions | ||||||
| Class A | 0.8 | 1 | 1 | 2 | 3 | 3 |
| Class B | 22 | 25 | 55 | 18 | 28 | 32 |
| Unplanned Interruptions | ||||||
| Class C | 82 | 85 | 94 | 110 | 51 | 50 |
| Class D | 0.8 | 1 | 3 | 6 | 7 | 2 |
| Class E* | 0 | 0 | 0 | 0 | ||
| Class F | 0 | 0 | 0 | 0 | ||
| Class G | 0 | 0 | 0 | 0 | ||
| Class H | 0 | 0 | 0 | 0 | ||
| Class I | 0 | 0 | 0 | 0 | ||
| Total | 153 | 136 | 89 | 87 |
Proportion of Total Class C Interruptions not restored:
| 2000 | 1999 | 1998 | 1997 | |
|---|---|---|---|---|
| Within 3 Hours | 18.00% | 16.00% | na | na |
| Within 24 Hours | 0.00% | 0.00% | na | na |
Faults
| Class | 2001/05 (Average Target) | 2001 (Target) | 2000 | 1999 | 1998 | 1997 |
|---|
Overall System
Faults per 100 circuit kilometres of prescribed voltage electric line
| 2.72 | 2.95 | 3.05 | 3.59 | 1.65 | 1.40 | |
| 33kV | 0.85 | 1.06 | 0.00 | 3.70 | 1.94 | 1.29 |
| 22kV | 0.14 | 0.68 | 0.00 | 1.37 | 0.00 | 0.00 |
| 11kV | 2.99 | 3.21 | 3.43 | 3.71 | 1.63 | 1.51 |
| 6.6kV | 2.50 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Overhead
Faults per 100 circuit kilometres of prescribed voltage electric line
| 3.26 | 3.64 | 1.58 | 1.43 | |||
| 33kV | 0.00 | 3.83 | 1.99 | 1.31 | ||
| 22kV | 0.00 | 1.37 | 0.00 | 0.00 | ||
| 11kV | 3.68 | 3.76 | 1.55 | 1.53 | ||
| 6.6kV | 0.00 | 0.00 | 0.00 | 0.00 |
Underground
Faults per 100 circuit kilometres of prescribed voltage electric line
| 0.00 | 2.75 | 2.94 | 1.04 | |||
| 33kV | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 22kV | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 11kV | 0.00 | 2.98 | 3.03 | 1.08 | ||
| 6.6kV | 0.00 | 0.00 | 0.00 | 0.00 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2000, No 115
Gazette.govt.nz —
NZ Gazette 2000, No 115
β¨ LLM interpretation of page content
ποΈ
Alpine Energy Limited Network Statistics - Continued
(continued from previous page)
ποΈ Infrastructure & Public WorksEnergy, Network Statistics, Electricity, Infrastructure