2292 NEW ZEALAND GAZETTE No. 95

Reliability Performance Measures

As at 31st March 1999

As required under the Electricity (Disclosure Information) Regulations 1999

Clause 22
Comprising Part 5 of Schedule 1

The following information is disclosed under the above regulations

1. Total number of interruptions

1998/9 1997/8 1996/7 1995/6
Planned Transpower 1 0 1 1
Planned CHB Power 68 21 41 69
Unplanned CHB Power 155 116 121 188
Unplanned Transpower 0 1 0 0
Other 0 0 0 0
Total Interruptions 224 138 163 258

2. Interruption Targets

1999/2000
Planned Interruptions 60
Unplanned Interruptions 150
Total Interruptions 210

3. Future Interruption Targets (Average for the next 5 years)

1999/2004
Planned Interruptions 56
Unplanned Interruptions 146
Total Interruptions 202

4. Fault Restoration Times

Within 3 hours Within 24 hours
Percentage Not Restored 17% 0%


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 95


NZLII PDF NZ Gazette 1999, No 95





✨ LLM interpretation of page content

πŸ—οΈ Reliability Performance Measures (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
31 March 1999
Electricity, Reliability, Performance Measures, Interruptions, Fault Restoration