Interruption Class 1999 1998 1997 1996 1995
A Planned Interruption by Transpower Number 1 5 2 0
SAIDI 1.7 31.5 26.9 0
SAIFI 0.00 0.32 0.24 0
CAIDI 37.0 99.9 112.0 0

| B | Planned Interruption by Other Line Owner | Number | 37 | 47 | 43 | 25 | 34 |
| | | SAIDI | 157.2 | 245.7 | 98.6 | 166 | 201 |
| | | SAIFI | 0.80 | 2.09 | 0.93 | 1.04 | 1.20 |
| | | CAIDI | 187.2 | 117.1 | 106.0 | 160 | 167 |

| C | Unplanned Interruption by Other Line Owner | Number | 99 | 84 | 178 | 59 | 88 |
| | | SAIDI | 361.6 | 989.7 | 748.0 | 499 | 1081 |
| | | SAIFI | 7.80 | 7.31 | 7.09 | 4.40 | 2.31 |
| | | CAIDI | 46.3 | 135.4 | 105.5 | 115 | 469 |

| D | Unplanned Interruption by Transpower | Number | 2 | 5 | 0 | 2 | 1 |
| | | SAIDI | 81.1 | 157.4 | 0 | 29 | 5 |
| | | SAIFI | 2.10 | 2.59 | 0 | 2.20 | 0.05 |
| | | CAIDI | 37.9 | 60.8 | 0 | 26 | 5 |

| E | Unplanned Interruption by ECNZ | Number | 0 | 0 | 0 | 1 | 0 |
| | | SAIDI | 0 | 0 | 0 | 7 | 0 |
| | | SAIFI | 0 | 0 | 0 | 1.00 | 0 |
| | | CAIDI | 0 | 0 | 0 | 7 | 0 |

| F | Unplanned Interruption by any other generator | Number | 0 | 0 | 0 | 0 | 0 |
| | | SAIDI | 0 | 0 | 0 | 0 | 0 |
| | | SAIFI | 0 | 0 | 0 | 0 | 0 |
| | | CAIDI | 0 | 0 | 0 | 0 | 0 |

| G | Unplanned Interruption not resulting from above | Number | 0 | 0 | 0 | 0 | 0 |
| | | SAIDI | 0 | 0 | 0 | 0 | 0 |
| | | SAIFI | 0 | 0 | 0 | 0 | 0 |
| | | CAIDI | 0 | 0 | 0 | 0 | 0 |

| Total | | Number | 139 | 141 | 223 | 87 | 125 |
| | | SAIDI | 602 | 1,424 | 872.8 | 729 | 1340 |
| | | SAIFI | 10.80 | 12.31 | 8.26 | 8.60 | 4.06 |
| | | CAIDI | 55.5 | 115.7 | 105.7 | 85 | 330 |

  • SAIDI - System Average Interruption Duration Index (minutes per customer per year)
  • SAIFI - System Average Interruption Frequency Index (interruptions per customer per year)
  • CAIDI - Customer Average Interruption Duration Index (minutes per customer interrupted)


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 175


NZLII PDF NZ Gazette 1999, No 175





✨ LLM interpretation of page content

πŸ—οΈ Reliability Performance Measures for Electricity Lines for the year ended 31 March 1999 (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Electricity, Reliability, Faults, Overhead lines, Underground lines, Prescribed voltage lines, SAIDI, SAIFI, CAIDI