✨ Electricity Performance Measures




NEW ZEALAND GAZETTE

No. 149

Counties Power Limited – Line Business

1 April 1998 to 31 March 1999

1. Financial Performance Measures

1999 1998 1997 1996
(a) Return on funds, being earnings before interest and tax (as adjusted), divided by average total funds employed (as adjusted). 7.3% 4.1% 2.2% 3.1%
(b) Return on equity, being net profit after tax (as adjusted), divided by average total equity (as adjusted). 6.1% 3.0% 1.8% 2.1%
(c) Return on investment 5.9% 18.5% 1.2% 2.3%

2. Efficiency Performance Measures

1999 1998 1997 1996
(a) Direct line costs per kilometre $934 $1,218 $1,176 $1,091
(b) Indirect line cost per consumer $83 $84 $79 $96

Indirect line cost per consumer has been calculated using estimated average consumer numbers. The methodology used to calculate this estimate is publicly available.

Note: 31 March 1999 financial and efficiency performance measures have been prepared in accordance with the requirements of the Electricity (Information Disclosure) Regulations 1999. Figures for previous years were prepared in accordance with the requirements of the Electricity (Information Disclosure) Regulations 1994. The method of calculation specified in the two sets of regulations is not identical, and consequently figures for 31 March 1999 are not directly comparable to the previous years.

COUNTIES POWER LIMITED

DISCLOSURE OF ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS PURSUANT TO REGULATION 21 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1999

SCHEDULE 1 - PART 4

YEAR TO 31 MARCH:
1999 1998 1997 1996
1. Energy delivery efficiency performance measures and statistics
(a) Load Factor 58.8% 56.8% 57.2% 57.1%
(b) Loss ratio 7.5% 7.7% 7.8% 8.2%
(c) Capacity utilisation 34.1% 35.9% 35% 37.8%
2. Statistics

| (a) System length, broken down by voltage
| 400 V | 1,343km | 1,297km | 1,273km | 1,262km |
| 33 kV | 169km | 169km | 173km | 173km |
| 22 kV | 78km | 78km | 78km | 22km |
| 11 kV | 1,708km| 1,677km| 1,471km| 1,477km|
| Total | 3,298km| 3,221km| 2,995km| 2,934km|

| (b) Circuit length of overhead lines, broken down by voltage
| 400 V | 1,185km| 1,144km| 1,110km| 1,104km|
| 33 kV | 169km | 169km | 173km | 173km |
| 22 kV | 77km | 77km | 77km | 22km |
| 11 kV | 1,624km| 1,602km| 1,410km| 1,454km|
| Total | 3,055km| 2,992km| 2,770km| 2,753km|

| (c) Circuit length of underground cables, broken down by voltage
| 400 V | 158km | 153km | 163km | 158km |
| 33 kV | Nil | Nil | Nil | Nil |
| 22 kV | 1km | 1km | 1km | Nil |
| 11 kV | 84km | 75km | 61km | 23km |
| Total | 243km | 229km | 225km | 181km |

| (d) Transformer capacity | 217,981kVA | 217,405kVA | 229,808kVA | 197,000kVA |

| (e) Maximum demand | 74,338kW | 78,034kW | 75,335kW | 79,493kW |

| (f) Total electricity supplied from the system | 333,540,000kWh | 338,230,000kWh | 348,059,000kWh | 342,592,000kWh |

| (g) Total electricity conveyed through the system | 4,315,000kWh | Nil | 1,831,400kWh | 1,477,500kWh |

| Total customers (average for period) | 30,859 | 30,478 | 29,977 | 29,860 |

DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES PURSUANT TO REGULATION 22 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1999

SCHEDULE 1 - PART 5

YEAR TO 31 MARCH
1999 1998 1997 1996
1. Total number of interruptions 316 365 465 527
(b) Planned interruptions by Counties Power 196 217 207 305
(c) Unplanned interruptions originating within Counties Power system 120 148 258 221
(d) Unplanned interruptions originating with Transpower system Nil Nil Nil 1

| 4. The proportion (expressed as a percentage) of the total number of Class C interruptions not restored within: |
| (a) 3 hours; | 20% | 21.6% | 18.2% | 21.7% |
| (b) 24 hours | 0% | 0% | 0.4% | 0% |

| 5. Total number of faults per 100 circuit kilometres of prescribed voltage electric line:
| 11 kV | 7.02 | 8.83 | 17.53 | 14.9 |
| 22 kV | 19.2 | 7.79 | 27.27 | 18.18 |
| 33 kV | 6.51 | 6.51 | 10.40 | 9.83 |
| Total | 6.14 | 7.85 | 17.09 | 13.28 |

| 6. Total number of faults per 100 circuit kilometres of underground prescribed voltage line and per different nominal line voltages:
| 11 kV underground | 2.38 | 3.95 | 1.64 | 8.7 |
| 22 kV underground | Nil | Nil | Nil | Nil |
| Total | 2.38 | 3.95 | 1.64 | 8.7 |

| 7. Total number of faults per 100 circuit kilometres of overhead prescribed voltage line and per different nominal line voltages:
| 11 kV overhead | 5.66 | 7.99 | 15.46 | 13.69 |
| 22 kV overhead | 19.2 | 7.79 | 27.27 | 18.18 |
| 33 kV overhead | 6.51 | 6.51 | 10.40 | 9.83 |
| Total | 6.14 | 7.85 | 15.48 | 13.34 |

| 8. The SAIDI for the total of interruptions (minutes) | 225.8 | 238.69 | 414.00 | 468.58 |



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 149


NZLII PDF NZ Gazette 1999, No 149





✨ LLM interpretation of page content

🌾 Financial Performance Measures for Counties Power Limited

🌾 Primary Industries & Resources
Financial performance, Return on funds, Return on equity, Return on investment, Direct line costs, Indirect line costs

🌾 Efficiency Performance Measures for Counties Power Limited

🌾 Primary Industries & Resources
Efficiency performance, Direct line costs, Indirect line costs, Consumer numbers

🌾 Energy Efficiency Performance Measures and Statistics for Counties Power Limited

🌾 Primary Industries & Resources
Energy delivery efficiency, Load factor, Loss ratio, Capacity utilisation, System length, Circuit length, Transformer capacity, Maximum demand, Electricity supplied, Electricity conveyed, Customer numbers

🌾 Reliability Performance Measures for Counties Power Limited

🌾 Primary Industries & Resources
Reliability performance, Interruptions, Planned interruptions, Unplanned interruptions, Class C interruptions, Faults per circuit kilometre, SAIDI