✨ Energy Delivery Efficiency Performance Measures




11 OCTOBER

ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

(For the purposes of the Electricity (Information Disclosure) Regulations 1999

FIRST SCHEDULE - PART 4

1999 1998 1997 1996
1. Energy Delivery Efficiency Performance Measures
(a) Load Factor 58.06% 56.71% 55.46% 62.42%
(b) Loss Ratio 4.47% 4.50% 4.34% 4.25%
(c) Capacity Utilisation 35.40% 35.15% 35.95% 30.04%

2. Statistics

(a) System Length (in kilometres)

400V 6.6kV 11kV 22kV 33kV 110kV Total
1999 4,747.18 414.45 3,236.26 251.46 294.42 70.66 9,014.41
1998 4,732.28 415.89 3,092.57 249.90 261.49 60.86 8,812.99
1997 4,714.19 419.40 2,944.89 249.90 240.46 60.86 8,629.70
1996 4,685.18 421.47 2,924.83 249.65 240.46 60.86 8,582.45

(b) Total Circuit Length (in kilometres) of Overhead Electric Lines

400V 6.6kV 11kV 22kV 33kV 110kV Total
1999 1,800.60 91.99 1,177.86 0.00 64.66 5.25 3,140.36
1998 1,809.10 93.74 1,196.22 0.00 64.66 0.00 3,163.71
1997 1,823.96 97.25 1,216.90 0.00 64.66 0.00 3,202.76
1996 1,831.76 99.00 1,216.31 0.00 64.66 0.00 3,211.73

NEW ZEALAND GAZETTE



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 147


NZLII PDF NZ Gazette 1999, No 147





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures and Statistics for Vector Limited (continued from previous page)

🏭 Trade, Customs & Industry
Energy Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Electricity