✨ Electricity Performance Measures




NEW ZEALAND GAZETTE

No. 144

BAY OF PLENTY ELECTRICITY LIMITED

Performance Measures for the purposes of the Electricity (Information Disclosure) Regulations 1999

Performance Measures

for the 12 Months ended 31 March 1999

Disclosure of Financial Performance Measures and Efficiency Performance Measures pursuant to Regulations 15, 21 and 22 of the Electricity (Information Disclosure) Regulations 1999.

Regulation 22 Reliability Performance Measures (Continued):

  1. The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
2000 1999 1998 1997 1996
110 kV - - - - 2
33 kV - - - - -
11 kV - - 2 1 -
Total Underground faults / 100km - - 2 1 2
  1. The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
2000 1999 1998 1997 1996
110 kV - - - - 5
33 kV - 1 - 1 9
11 kV 10 9 10 12 9
Total Overhead Faults / 100km 10 9 10 11 9
  1. The SAIDI for the total number of interruptions

| | 691 | 414 | 390 | 530 |

  1. SAIDI Targets:
    a) Planned interruptions (Class B) 75
    b) Unplanned interruptions (Class C) 165

  2. Average SAIDI Targets (Next 5 Years):
    a) Planned interruptions (Class B) 65
    b) Unplanned interruptions (Class C) 150

  3. The SAIDI for the total number of interruptions within each interruption class:

Class 2000 1999 1998 1997 1996
Class A 62 83 - - 70
Class B 81 118 97 - 151
Class C 172 176 207 - 252
Class D 377 38 76 - 54
Class E - - - - -
Class F - - - - -
Class G - - - - -
  1. The SAIFI for the total number of interruptions.

| | 4.79 | 4.80 | 5.15 | 5.60 |

  1. SAIFI Targets:
    a) Planned interruptions (Class B) 0.47
    b) Unplanned interruptions (Class C) 2.60


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 144


NZLII PDF NZ Gazette 1999, No 144





✨ LLM interpretation of page content

🏭 Performance Measures for Bay of Plenty Electricity Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Financial Performance, Efficiency Performance, Reliability Performance, SAIDI, SAIFI, Faults, Interruptions, Bay of Plenty Electricity Limited, Electricity (Information Disclosure) Regulations 1999