NETWORK TASMAN LIMITED

STATEMENT OF PERFORMANCE MEASURES

FOR THE YEAR ENDING 31 MARCH 1999

1999 1998 1997 1996
b. Underground Cable Length
33 kV system 3 3 3 3
11 kV system 110 102 100 97
6.6 kV system 1 1 1 1
400 V system 328 313 301 292
Total Kilometers 443 419 405 393
1999 1998 1997 1996
Transformer Capacity (kVA) 314,717 296,476 277,849 256,279
Maximum Demand (kW) 108,944 111,370 106,804 109,597
Total Electricity Supplied (kWh) 586,496,577 580,688,970 566,924,039 554,962,010
Electricity Conveyed for Others (kWh) 278,365,612 158,085,189 157,340,504 155,471,693
Total Consumers 29,750 29,272 28,982 28,806

5. RELIABILITY PERFORMANCE MEASURES TO BE DISCLOSED BY LINE OWNERS

Total number of Interruptions

1999 1998 1997 1996
Class A TransPower Planned 6 0 0 3
Class B Line Owner Planned 162 182 161 129
Class C Line Owner Unplanned 140 140 115 121
Class D TransPower Unplanned 6 6 1 6
Class E Unplanned ECNZ 0 0 0 0
Class F Unplanned Other Generator 0 0 0 0
Class G Other 0 0 0 0
TOTAL 314 328 277 259

Interruption Targets

Planned Interruptions 172
Unplanned Interruptions 108

Average Interruption Targets (5 years)

1999/2004
Planned Interruptions 130
Unplanned Interruptions 90

Fault Restoration Times (Class C)

Within 3 hrs Within 24 hrs
Percentage not restored 20% 0%


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 143


NZLII PDF NZ Gazette 1999, No 143





✨ LLM interpretation of page content

🏭 Network Tasman Limited Performance Measures for 1999 (continued from previous page)

🏭 Trade, Customs & Industry
2 September 1999
Financial Performance, Efficiency, Energy Delivery, Statistics, Network Tasman Limited