✨ Electricity Reliability Statistics




2978 NEW ZEALAND GAZETTE No. 124

Class F - being an unplanned interruption originating within works used, by persons other than the principal line owner, for the generation of electricity 0 0 0 0
Class G - being an unplanned interruption caused by another line owner 0 0 0 0
Class H - being a planned interruption caused by another line owner 0 0 0 0
Class I - being an interruption not referred to in any of paragraphs (a) to (h) 0 0 0 0
The CAIDI for the total number of interruptions 139.7 134 114 89
CAIDI Targets 2000 5 Year Average
Class B - being a planned interruption by the principal line owner (other than Transpower) 130 120
Class C - being an unplanned interruption originating within the works of the principal line owner where those works are used for carrying out line business activities 130 120


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 124


NZLII PDF NZ Gazette 1999, No 124





✨ LLM interpretation of page content

πŸ—οΈ Reliability Performance Measures for Electricity Interruptions (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Electricity, Faults, Interruptions, Reliability, Performance Measures, Statistics