✨ Electricity Reliability Performance




15 SEPTEMBER NEW ZEALAND GAZETTE 2899

8, 11,
12, 15,
16, 19, SAIDI, SAIFI and CAIDI by interruption class and in total for 1998/99:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions SAIDI (minutes per connected customer) SAIFI (interruptions per connected customer) CAIDI (minutes per customer interrupted)
Orion B Planned Shutdowns 17.5 0.095 185.6
C Unplanned Cuts 50.17 0.745 67.3
Subtotal 67.7 0.840 80.6
Transpower A Planned Shutdowns 0.5 0.001 475.2
D Unplanned Cuts 1.2 0.086 14.0
Subtotal 1.7 0.087 19.3
TOTAL 69.4 0.927 74.9

8, 11,
12, 15,
16, 19, SAIDI, SAIFI and CAIDI by interruption class and in total for 1997/98:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions SAIDI (minutes per connected customer) SAIFI (interruptions per connected customer) CAIDI (minutes per customer interrupted)
Orion B Planned Shutdowns 28.8 0.172 167.5
C Unplanned Cuts 52.8 0.838 63.0
Subtotal 81.6 1.010 80.7
Transpower A Planned Shutdowns 0.7 0.004 187.2
D Unplanned Cuts - - -
Subtotal 0.7 0.004 187.2
TOTAL 82.3 1.014 81.1


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 121


NZLII PDF NZ Gazette 1999, No 121





✨ LLM interpretation of page content

🏭 Disclosure of Reliability Performance Measures by Line Owners (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Reliability Performance, Faults, Voltage Lines, Statistics, Targets