✨ Electricity Reliability Statistics




2862 NEW ZEALAND GAZETTE No. 120

Reliability Performance Measures for the Year Ended 31 March 1998

Consumer Connections Line 33kV Line 11kV Line 6.6kV Cable 33kV Cable 11kV Cable 6.6kV Total Density Con/km
At start of period 49,891 149.9 236.6 488.9 75.2 20.7 230.6 1,202
At end of period 49,917 149.9 236.6 491.2 75.2 20.9 230.9 1,205
Average 49,904 149.9 236.6 490.1 75.2 20.8 230.7 1,203
Totals 876.6 326.7 1,203

Reliability Measure

SAIDI SAIFI CAIDI No of Interruptions Class
Cons Mins Mins/Cons Cons Int Int/Cons Mins/Int
Distributor Planned 232,472 4.66 2,945 0.06 78.90 113 B
Distributor Unplanned 1,623,300 32.53 48,436 0.97 33.50 131 C
Subtotal 1,855,772 37.19 51,381 1.03 36.10 244
Transpower Planned - - - - - A
Transpower Unplanned - - - - - D
Subtotal - - - - -
ECNZ Planned - - - - - G
ECNZ Unplanned - - - - - E
Subtotal - - - - -
Other Gen Planned - - - - - F
Other Gen Unplanned - - - - -
Other Than Above - - - - -
Subtotal - - - - -
TOTAL 1,855,772 37.19 51,381 1.03 36.10 244

Faults by Voltage

OH Faults OH Length km OH per 100 km Cable Faults UG Length km UG per 100 km
33kV 10 149.9 6.7 1 75.2 1.3
11kV 51 236.6 21.6 3 20.8 14.4
6.6kV 52 490.1 10.6 8 230.7 3.5
TOTAL 113 876.6 12.9 12 326.7 3.7

Total Lines and Cables

Total Faults Total Length in km Faults per 100 km
125 1,203 10.4


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 120


NZLII PDF NZ Gazette 1999, No 120





✨ LLM interpretation of page content

πŸ’° Reliability Performance Measures for Electricity (continued from previous page)

πŸ’° Finance & Revenue
Reliability Measures, Statistics, Electricity, Regulation 22