RELIABILITY PERFORMANCE MEASURES (REGULATION 22)
Reliability Performance Measures for the Year Ended 31 March 1999
| Consumer Connections | Line 33kV | Line 11kV | Line 6.6kV | Cable 33kV | Cable 11kV | Cable 6.6kV | Total | Density Con/km | |
|---|---|---|---|---|---|---|---|---|---|
| At start of period | 49,917 | 149.9 | 236.6 | 491.2 | 75.2 | 20.9 | 230.9 | 1,205 | 41.4 |
| At end of period | 50,200 | 149.9 | 236.7 | 491.9 | 75.2 | 21.1 | 231.6 | 1,206 | 41.6 |
| Average | 50,059 | 149.9 | 236.7 | 491.5 | 75.2 | 21.0 | 231.2 | 1,206 | 41.5 |
| Totals | 878.1 |
Reliability Measure
| Reliability Measure | SAIDI Cons Mins | SAIDI Mins/Cons | SAIFI Cons Int | SAIFI Int/Cons | CAIDI Mins/Int | No of Interruptions | Class |
|---|---|---|---|---|---|---|---|
| Distributor Planned | 136,119 | 2.72 | 1,731 | 0.33 | 78.60 | 93 | B |
| Distributor Unplanned | 2,412,772 | 48.20 | 52,829 | 1.06 | 45.7 | 129 | C |
| Subtotal | 2,548,891 | 50.92 | 54,560 | 1.09 | 46.7 | 222 | |
| Transpower Planned | - | - | - | - | - | - | A |
| Transpower Unplanned | - | - | - | - | - | - | D |
| Subtotal | - | - | - | - | - | - | |
| Generator Unplanned | - | - | - | - | - | - | F |
| Embedded Unplanned | - | - | - | - | - | - | E |
| Subtotal | - | - | - | - | - | - | |
| Other Line Owner Planned | - | - | - | - | - | - | H |
| Other Line Owner Unplanned | - | - | - | - | - | - | |
| Other Than Above | - | - | - | - | - | - | G |
| Subtotal | - | - | - | - | - | - | I |
| TOTAL | 2,548,891 | 50.92 | 54,560 | 1.09 | 46.7 | 222 |
Faults by Voltage
| Faults by Voltage | OH Faults | OH Length km | OH per 100 km | Cable Faults | UG Length km | UG per 100 km |
|---|---|---|---|---|---|---|
| 33kV | 10 | 149.9 | 6.7 | 1 | 75.2 | 1.3 |
| 11kV | 30 | 236.7 | 21.7 | 2 | 21.0 | 9.5 |
| 6.6kV | 44 | 491.5 | 9.0 | 7 | 231.2 | 3.0 |
| TOTAL | 84 | 878.1 | 9.6 | 10 | 327.4 | 3.1 |
| Total Faults | Total Length in km | Faults per 100 km | |
|---|---|---|---|
| Total Lines and Cables | 94 | 1,205.5 | 7.8 |
No of unplanned interruptions not restored within 3 hours ... 23
No of unplanned interruptions not restored within 24 hours ... nil
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 120
NZLII —
NZ Gazette 1999, No 120
β¨ LLM interpretation of page content
π°
Reliability Performance Measures for Electricity
(continued from previous page)
π° Finance & RevenueReliability Measures, Statistics, Electricity, Regulation 22