6. Reliability Performance Measures
| YEAR ENDED 31 MARCH |
1996 |
1997 |
1998 |
1999 |
|
|
|
|
7.8% |
Number of Interruptions
|
A Planned Transpower |
B Planned Distributor |
C Unplanned Distributor |
D Unplanned Transpower |
E Unplanned ECNZ |
F Unplanned Generator |
G Unplanned Other |
Total |
| 1996 |
0 |
21 |
56 |
20 |
1 |
0 |
1 |
98 |
| 1997 |
0 |
20 |
68 |
0 |
4 |
0 |
0 |
92 |
| 1998 |
0 |
7 |
88 |
0 |
0 |
0 |
0 |
95 |
| 1999 |
10 |
78 |
139 |
0 |
0 |
0 |
84 |
311 |
Proportion of Class C Interruptions Not Restored Within: 3 hrs 4 hrs
Total Number of Faults per 100km of HV System
|
Total Number of Faults per 100km of Underground HV Circuit |
Total Number of Faults per 100km of Overhead HV Circuit |
| 1996 |
5.466 |
33kV 11kV |
|
|
11.503 10.109 |
| 1997 |
8.696 |
11.322 10.148 |
| 1998 |
9.959 |
10.262 10.109 |
| 1999 |
5.036 |
11.503 10.163 |
Total Number of Faults
|
33kV |
11kV |
Total |
| 1996 |
0 |
0 |
0 |
| 1997 |
0 |
0 |
0 |
| 1998 |
0 |
0 |
0 |
| 1999 |
10 |
10 |
10 |
SAIDI
|
Total Interruptions |
| 1996 |
1450 |
| 1997 |
5768 |
| 1998 |
5221 |
| 1999 |
4489 |
|
A Planned Transpower |
B Planned Distributor |
C Unplanned Distributor |
D Unplanned Transpower |
E Unplanned ECNZ |
F Unplanned Generator |
G Unplanned Other |
| 2000 |
10 |
80 |
68 |
1 |
5 |
76 |
12 |
| 2001 |
10 |
80 |
68 |
1 |
5 |
51 |
10 |
| TARGETS 2002 |
10 |
80 |
90 |
1 |
5 |
41 |
41 |
| 2003 |
8 |
80 |
88 |
1 |
5 |
51 |
10 |
| 2004 |
8 |
80 |
88 |
1 |
5 |
51 |
41 |
SAIDI (Total Interruption Duration)
|
A Planned Transpower |
B Planned Distributor |
C Unplanned Distributor |
D Unplanned Transpower |
E Unplanned ECNZ |
F Unplanned Generator |
G Unplanned Other |
Total |
| 1996 |
0 |
90.745 |
5.402 |
103.580 |
0 |
49.940 |
27.938 |
|
| 1997 |
0 |
5.740 |
14.840 |
53.640 |
0 |
35.340 |
61.117 |
|
| 1998 |
0 |
5.256 |
63.280 |
48.489 |
0 |
12.680 |
50.600 |
|
| 1999 |
76 |
87.410 |
4.221 |
5.698 |
0 |
72.570 |
53.640 |
|
| 2691 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
β¨ LLM interpretation of page content
π
Waitaki Power Limited Financial and Efficiency Performance Measures
(continued from previous page)
π Trade, Customs & Industry
Financial Performance, Efficiency Measures, Energy Delivered, Optimised Deprival Valuation, Network Statistics, System Length, Transformer Capacity, Maximum Demand, Electricity Supplied, Electricity Conveyed, Customers
π
Reliability Performance Measures for Waitaki Power Limited
π Trade, Customs & Industry
Reliability, Interruptions, Faults, SAIDI, Power Distribution, Performance Metrics