Electricity Reliability Performance Measures




6 SEPTEMBER

NEW ZEALAND GAZETTE

2643

SECTION 3 EXPLANATION OF TERMS

* = Actual Results - All Others Are Targets
km = kilometres
kV = kilovolts (e.g. 11kV = 11,000 volts)
kVA = kilovolt amperes
kW = kilowatts
kWh = kilowatt hours
GWh = Gigawatt hours (e.g. 1 GWh = 1,000,000 kWh)
ODV = Optimised Deprival Valuation

| Class A | = | Planned interruptions by Transpower |
| Class B | = | Planned interruptions by Alpine Energy |
| Class C | = | Unplanned interruptions by Alpine Energy|
| Class D | = | Unplanned interruptions by Transpower |
| Class E | = | Unplanned interruption on “generation” lines used by Alpine Energy |
| Class F | = | Unplanned interruption on “generation” lines used by other line owners |
| Class G | = | Unplanned interruptions by other line owners |
| Class H | = | Planned interruptions by other line owners |
| Class I | = | Planned interruptions not referred in A-H |

The three reliability performance measures are defined as follows:

SAIDI is the total consumer minutes lost/total consumers (average interruption for all consumers).

SAIFI is the total consumers affected/total consumers (average interruptions per year for all consumers).

CAIDI is the total consumer minutes lost/total consumers affected (length of average interruption).



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 110


NZLII PDF NZ Gazette 1999, No 110





✨ LLM interpretation of page content

🏭 Alpine Energy Limited Reliability Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Reliability, Interruptions, CAIDI, SAIDI, SAIFI, Performance Measures