✨ Performance Measures and Statistics




NEW ZEALAND GAZETTE

No. 167

TRANSALTA NEW ZEALAND LIMITED

Performance Measures and Statistics (Continued)

For the Year Ended 31 March 1998

Regulation 18

4. Reliability Performance Measures

31-Mar-98 31-Mar-97
Unplanned interruptions in transmission system N/A N/A
Unplanned interruptions in distribution system (other than as below) 0.16 Nil
Unplanned interruptions in distribution system (resulting from interruption of transmission system) Nil Nil

The information disclosed in the 1998 Information Disclosure package issued by TransAlta New Zealand Limited has been prepared solely for the purposes of the Gas (Information Disclosure) Regulations 1997.

The information should not be used for any other purpose than that intended under the regulations.



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 167


NZLII PDF NZ Gazette 1998, No 167





✨ LLM interpretation of page content

🏭 Performance Measures and Statistics of TransAlta New Zealand Limited (continued from previous page)

🏭 Trade, Customs & Industry
28 August 1998
Performance Measures, Statistics, Gas, Information Disclosure, TransAlta New Zealand Limited